Ascension Parish, LA Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit trigger
Any new, altered or replaced electrical system
Residential new construction fee
$200 flat
Other residential electrical fee
$50 flat
Working without permit fine
$200 to $500
Mobile home connection fee
$25 per trade
Applies to
Unincorporated Ascension Parish only

Summary

Unincorporated Ascension Parish requires a permit before installing, altering or replacing any electrical system under Sec. 6-1(b), applying the National Electric Code as adopted by the state Uniform Construction Code Council under Sec. 6-2. Residential new-construction electrical work runs a flat $200 fee; other residential electrical work is $50.

These county ordinances apply to unincorporated areas of Ascension Parish. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(b)Except as hereinafter provided, it shall be unlawful to construct, enlarge, alter, repair, move, demolish, or change the occupancy of any building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by the technical codes, or to cause any such work to be done, without first making application to the building official to obtain the required permit(s) for the work. ... 204.5. Electrical. The provisions of the National Electric Code as adopted and amended by the LSUCCC shall apply to matters governing the repair, alteration, change of occupancy, addition to and relocation of existing buildings.

Full Breakdown

Sec. 6-1(b) bars anyone from erecting, installing, enlarging, altering, repairing, removing, converting or replacing any electrical system without first applying to the building official for the required permit. Sec. 5, applies the National Electric Code as adopted and amended by the Louisiana State Uniform Construction Code Council to that work. Sec. 6-7's temporary-power provision lets the building official approve temporary electrical service before a job is finished, provided it meets the temporary lighting, heat or power requirements of NFPA 70 as adopted by the LSUCCC.

Sec. 6-8 sets the fee schedule: a residential new-construction electrical permit is $200 flat, any other residential electrical permit is $50, and a mobile home electrical connection permit is $25. Commercial electrical permits are tiered by construction valuation, from $125 for jobs under $100,000 up to $600 for jobs over $2,000,000. Starting electrical work before the permit issues draws a separate fine under Sec. 6-8, item 802, of a minimum $200 and up to $500, in addition to the required fee, and each failed inspection costs a $30 re-inspection fee per craft.

A permit is not valid, and cannot be amended, until the fee is paid under Sec. 6-8, item 800. Wiring must remain accessible for the building official's inspection until approved, per Sec. 6-9.

Violations & Fines

Beginning electrical work before the permit issues is fined a minimum of $200.00 and up to $500.00 under Sec. 6-8, item 802, on top of the permit fee, and the permit itself is void until the fee is paid under Sec. 6-8, item 800. Each failed electrical inspection triggers a $30 re-inspection fee, which must be paid before the building official will authorize utilities or issue a certificate of occupancy.

Frequently Asked Questions

Do I need a permit for electrical work in unincorporated Ascension Parish?
Yes. Sec. 6-1(b) makes it unlawful to install, alter, repair or replace an electrical system without first applying to the building official for a permit. Sec. 6-2, item 204.5, applies the National Electric Code, as adopted by the Louisiana State Uniform Construction Code Council, to that work.
How much is a residential electrical permit in Ascension Parish?
Sec. 6-8 sets a flat $200 fee for a residential new-construction electrical permit and $50 for any other residential electrical permit, such as a repair or panel upgrade. A mobile home electrical connection permit runs $25, and commercial electrical permits are tiered by construction valuation.
Can I get temporary power before my electrical work is finished?
Yes. Sec. 6-7 lets the building official authorize temporary electrical service before an installation is fully complete, as long as the temporary wiring meets the lighting, heat and power requirements of NFPA 70 as adopted by the Louisiana State Uniform Construction Code Council.

Sources & Official References

Other rules in Ascension Parish

All Ascension Parish rules

Compare Ascension Parish to another location·View the Louisiana building safety overview

Get notified when Electrical Permits in Ascension Parish, LA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.