Anne Arundel County, MD Building Safety: Electrical Permits (2026)
Key Facts
- Adopted code
- 2020 NFPA 70 (NEC)
- Permit required
- before electrical work begins
- Enforcing agency
- Dept. of Inspections and Permits
- No-permit penalty
- Class C offense, $500 first
- Code-violation penalty
- Class D offense, $125 first
Summary
Anne Arundel County adopts the 2020 National Electrical Code (NFPA 70) as its Electrical Code and requires a permit from the Department of Inspections and Permits before any electrical installation, alteration, or repair begins.
Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the use, tenant, or occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert, or replace any electrical, gas, mechanical, or plumbing system, the installation of which is regulated by the Construction Code, or to cause any such work to be done, shall first make application to the Code Official and obtain the required permit. 105.1.1 Annual permit. In lieu of an individual permit for each alteration to an already approved electrical, gas, mechanical, or plumbing installation, the Code Official is authorized to issue an annual permit upon application therefor to any person, firm, or corporation regularly employing one or more qualified trade persons in the building, structure, or on the premises owned or operated by the applicant for the permit. 105.1.2 Annual permit records. The person to whom an annual permit is issued shall keep a detailed record of alterations made under such annual permit. The Code Official shall have access to such records at all times or such records shall be filed with the Code Official as designated.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-93: County Code is current through May, 2026).
Full Breakdown
Under County Code § 15-2-202, Anne Arundel County adopts the National Electrical Code (NFPA 70), 2020 Edition, as its Electrical Code, with local amendments set out in the Construction Code Supplement. Section 105.1 of that Supplement, Chapter 1 of the Construction Code, which the Supplement expressly makes Article 80 of the adopted NEC, requires any owner or authorized agent who intends to erect, install, alter, remove, convert, or replace any electrical system to first apply to the Code Official (the Director of Inspections and Permits) and obtain a permit. Only narrow work is exempt: lamp replacement, reinstalling attachment plugs, same-capacity overcurrent-device repair, and similar minor items. This same rule and code apply throughout unincorporated communities like Glen Burnie and Severna Park, since neither has its own government.
Violations & Fines
Performing electrical work without the required permit is a Class C civil offense ($500 first violation, $1,000 after); violating the Electrical Code itself is a separate Class D civil offense ($125/$500/$1,000).
Frequently Asked Questions
Do I need a permit for a minor electrical repair in Anne Arundel County?
Does this apply in Glen Burnie or Severna Park?
What happens if I do electrical work without a permit?
Sources & Official References
Other rules in Anne Arundel County
Compare Anne Arundel County to another location·View the Maryland building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.