McHenry County, IL Building Safety: Electrical Permits (2026)
Key Facts
- Adopted code
- 2020 National Electrical Code, amended
- Permit issuer
- Planning & Development Department
- Exempt work
- Lamp swaps, plugging into existing outlets
- Inspection required
- Before energization by utility
- Rough-in timing
- Before covering, fixtures, or framing
- Effective ordinance
- O-202211-10-050
Summary
Any electrical service work in unincorporated McHenry County, new wiring, a service change, or equipment modification, needs a permit from the Planning & Development Department before work starts under the county's adopted 2020 National Electrical Code. Minor repairs like lamp replacement or plugging into an existing outlet are exempt, but a permitted job must pass a building-official inspection before the utility is authorized to energize it.
(A) Permits. Electrical wiring and equipment associated with an electrical service shall not be installed, replaced or otherwise modified without first submitting a permit application, securing approval and a permit through the McHenry County Planning & Development Department. (B) Exemptions. It shall not be necessary to obtain a permit for minor repair work. ... (C) Inspections. Electrical wiring and equipment associated with an electrical service installed, replaced, or otherwise modified that required a permit shall be inspected by the building official. (1) Upon the installation of an electrical service or alteration of any electrical equipment associated with the electrical service the owner or owner's agent shall be responsible for notifying the building official to conduct a Service Inspection. If the installation or alterations are in compliance with this code, then the building official issue written notification to the electric utility company authorizing the electric utility company to energize the system.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2025 S-5: Supplement contains: Local legislation current through Ord. A25-0037, passed 8-19-2025 | State legislation current through ALS 2025 Pamphlet No. 1).
Full Breakdown
McHenry County adopted the 2020 National Electrical Code with local amendments under Section 15.12.010, Ordinance O-202211-10-050. The county added its own enforcement article, 90.4, spelling out exactly when a permit is required. Subsection (A), Permits, states electrical wiring and equipment 'associated with an electrical service shall not be installed, replaced or otherwise modified without first submitting a permit application, securing approval and a permit through the McHenry County Planning & Development Department.'
Subsection (B), Exemptions, carves out several categories that skip the permit step: replacing lamps or plugging approved portable equipment into an already-approved permanent receptacle; radio and television transmitting-station equipment, though the power supply, towers and antennas for those stations still need a permit; temporary systems installed only to test or service other electrical equipment; and any work already listed as exempt under the adopted International Building Code, International Residential Code, or Article 90.2's scope section.
Subsection (C), Inspections, is what closes the loop: any permitted electrical work must be inspected by the building official, and the property owner or their agent is responsible for notifying the building official to schedule that Service Inspection once the work is done. Only after the building official confirms the installation complies with the code does the county issue written notification to the electric utility company authorizing it to energize the system, meaning the power company will not turn the service on without that sign-off. Rough-in inspections of concealed wiring must also happen before it's covered, before fixtures are set, and before the framing inspection.
Violations & Fines
Doing permit-required electrical work without first securing a McHenry County permit, or skipping the required Service Inspection, means the building official will not issue the utility authorization to energize the system, leaving the service unpowered until the work is inspected and brought into compliance; the county's Building Official, appointed by the Director of Planning and Development, enforces this article.
Frequently Asked Questions
Do I need a permit to have an electrician change my home's electrical panel in unincorporated McHenry County?
Can I replace a light fixture myself without a permit?
Who inspects electrical work and what happens after?
Is a permit required to install a temporary generator hookup for testing?
Sources & Official References
Other rules in McHenry County
Compare McHenry County to another location·View the Illinois building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.