Skip to main content
CityRuleLookup

Maui County, HI Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit issuer
Director, Dept. of Public Works
Issuance deadline
30 calendar days or deemed approved
Permit max life
5 years from issuance
Engineer stamp trigger
30 kVA demand load or more
Work-without-permit fee
Set in annual budget ordinance
Governing code
National Electrical Code as amended

Summary

Maui County requires a permit from the Department of Public Works director before any electrical work begins. The National Electrical Code, as amended by the county, lists narrow exceptions such as government-agency work and low-voltage systems, but otherwise every installation, alteration, or repair needs sign-off first.

These county ordinances apply to unincorporated areas of Maui County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

104-4. Permit required; exceptions. (a) No person shall perform any electrical work or cause or allow the same to be performed unless a permit has been obtained from the director. The following work and installations shall not require a permit: ... (9)Work performed on buildings or premises for any federal or state governmental agency, provided the federal or state agency requests an exemption in writing, on a form prescribed by the director for such purpose.

Full Breakdown

" The same section lists eleven categories exempt from that requirement, including work for a County department with a written exemption request, replacement of a fixed motor with one of the same horsepower at the same location, residential low-voltage systems like security alarms and irrigation controllers, holiday lighting removed within ninety days, and work for federal or state agencies that request an exemption in writing. A separate permit is required for each building or structure under Section 104-5, and the director must issue a permit within thirty calendar days of a complete application or the application is deemed approved under Section 104-9.

Only specific people can hold a permit under Section 104-10: a licensed electrical contractor, a supervising or journey worker electrician employed by the county for county projects, or a supervising or journey worker electrician applying to work on a dwelling they own and occupy. Permits expire if the director does not approve the initial inspection within one year of issuance, and even with approval a permit cannot remain active longer than five years under Section 104-11. Plans stamped by a licensed electrical engineer are required whenever the demand load reaches 30 kilovolt-amperes or more under Section 104-7, though single-family dwellings with service metering rated no more than 320 amperes are exempt from that engineering requirement.

Violations & Fines

Article 107 sets the financial consequences for noncompliance. Under Section 107-2(a), starting work for which a permit is required before obtaining one triggers a penalty fee set in the annual budget ordinance, and paying that fee does not relieve the person from the code's other requirements or penalties. Section 107-2(b) imposes a separate fee when power has been supplied to an installation before it passes required inspection, and Section 107-2(c) imposes a fee when wiring is concealed before an inspection approval, payable before the county will accept a hold-harmless agreement for the concealed work.

Frequently Asked Questions

Do I need a permit for electrical work at my Maui home?
Generally yes. Maui County Code Section 16.18B.104-4(a) requires a permit from the director for electrical work with only narrow exceptions, such as replacing a fixed motor of the same rating at the same location or installing low-voltage residential systems like alarms and irrigation controllers.
Who is allowed to obtain an electrical permit in Maui County?
Section 104-10 limits permits to a licensed electrical contractor, a supervising or journey worker electrician employed by the county for county projects, or a supervising or journey worker electrician working on a dwelling that person owns and occupies.
How long does a Maui County electrical permit stay valid?
It expires if the director does not approve the initial inspection within one year of issuance under Section 104-11, and even with an approved inspection, the permit cannot remain active for more than five years from the date it was issued.
What happens if electrical work starts without a permit?
Section 107-2(a) imposes a penalty fee set in the annual budget ordinance for work commenced without a permit, and paying it does not excuse the person from otherwise complying with the code or from any other penalties the department can impose.

Sources & Official References

Other rules in Maui County

All Maui County rules

Compare Maui County to another location·View the Hawaii building safety overview

Get notified when Electrical Permits in Maui County, HI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.