Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Re-inspection fee
Charged if inspection card is missing
Card issued by
Code Enforcement Division at permit approval
Final inspection
Required before any occupancy
Max penalty
$1,000 fine or 1 year jail
Governing section
Code of Ordinances § 500.350

Summary

Jefferson County's Building Code requires the Code Official to inspect permitted work at each construction stage, and forbids work from continuing past an inspection point without written approval under Section 500.350. Permit holders must post an inspection card on the job site, request a final inspection before occupancy, and pay a re-inspection fee if the card is missing or lost.

These county ordinances apply to unincorporated areas of Jefferson County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

After issuing a permit, the Code Official shall conduct inspections from time to time during and upon completion of the work for which a permit has been issued. The Code Official shall maintain a record of all such examinations and inspections and of all violations of this Code. No work shall be done on any part of the structure beyond the point indicated in each successive inspection without first obtaining the written approval of the Code Official or his authorized representative. ... Upon completion of the work described in the permit application, the permit holder shall request and obtain a final inspection before any occupancy of the structure. Failure of the permit holder to request and obtain a final inspection before occupancy will constitute a violation of this Code.

Full Breakdown

350 sets the inspection sequence for any project under a Jefferson County building permit. After a permit issues, the Code Official conducts inspections from time to time during construction and upon completion, keeping a record of every examination and any Code violation found. No work may proceed past the point covered by a given inspection until the Code Official or an authorized representative gives written approval, and the permit holder is notified of any violations found along the way. The permit holder bears the duty to request and obtain a final inspection before occupying the completed structure; skipping that step is itself a Code violation.

The Code Enforcement Division issues an inspection card when the permit is approved, and that card, together with the approved plans, must stay on the job site until final inspection is complete. Inspection calls must be scheduled in advance as the card directs, and the card must be posted and accessible to the inspector at the time of the visit. If the card is missing, the County may charge the re-inspection fee set in the Jefferson County fee schedule; a lost card can be replaced only after paying the additional-inspection fee.

Where a job requires a licensed tradesperson, that licensee must write their name and license number on the card before starting work, and the card must show the permit number. New, altered, extended, or replaced plumbing must stay uncovered until tested and approved, and the Code Official can order concealed work reopened for testing if it was covered too soon.

Violations & Fines

Proceeding with construction beyond an uninspected stage, or occupying a structure without the required final inspection, violates Section 500.350(C) and Section 500.300 of the Building Code, a misdemeanor carrying a fine of up to one thousand dollars, imprisonment up to one year, or both, with each day treated as a separate offense. The Code Official can also issue a stop-work order under Section 500.310, halting all work immediately until the violation is corrected.

Frequently Asked Questions

Do I need a final inspection before moving into a permitted structure?
Yes. Section 500.350(C) requires the permit holder to request and obtain a final inspection upon completing the work described in the permit before any occupancy. Failing to request and obtain that final inspection before occupying the structure is itself a violation of the Jefferson County Building Code, separate from any physical defect in the work.
What happens if I lose my inspection card?
You can get a replacement from the Code Enforcement Division after paying the fee for an additional inspection listed in the County's fee schedule. Until it is replaced, absence of the card on the job site can trigger a re-inspection charge, and the card must be posted and accessible to the inspector at every scheduled visit.
Can I keep building past a stage that hasn't been inspected yet?
No. Section 500.350(B) bars any work beyond the point covered by each successive inspection until the Code Official or an authorized representative gives written approval. Approval is granted only after the inspector confirms that step of construction and clears any discrepancies, so skipping ahead risks a stop-work order and possible misdemeanor charges.

Sources & Official References

Other rules in Jefferson County

All Jefferson County rules

Compare Jefferson County to another location·View the Missouri building safety overview

Get notified when Building Inspections in Jefferson County, MO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.