York County, SC Building Safety: Building Inspections (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
York County Code § 150.40
Inspection stages
7 (footing to final)
First violation fine
Up to $200
Second violation fine
Up to $2,000
Permit lapse
Suspended after 180 days idle
Enforcing office
Building and codes department

Summary

York County's building and codes department inspects every permitted project at seven set stages, from footing and foundation through final inspection, before a certificate of occupancy issues. The permit holder must notify the department when work is ready and keep the permit posted on site.

City-specific rules exist: Rock Hill has its own building inspections rules that differ from York County's county-level regulations. If you live in Rock Hill, check the city-specific page instead.

(A) The building official or a representative of the building and codes department shall inspect or cause to be inspected all construction, installations or work for compliance with the provisions of this chapter. (B) The inspections shall be made at the minimum following specified intervals: (1) Footing, slab, and foundation inspection... (7) Final inspection. This inspection is to be made upon completion of all work and prior to occupancy. (C) Inspections. It shall be the duty of the permit holder to give reasonable advance notice to the department when work is ready for inspection and testing. A log of all requests for inspections shall be kept by the department so that a permanent record can be had of the times and dates when the requests for inspections were made.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-49: Supplement contains: Local legislation current through Ord. 3925, passed 6-16-25).

Full Breakdown

C. 40, the building official or a representative of the building and codes department inspects or causes to be inspected all construction, installations or work covered by the building chapter. The code sets seven minimum inspection intervals: footing, slab and foundation inspection after trenches are excavated, forms erected and reinforcing steel placed; concrete slab and under-floor inspection before concrete is poured or subfloor installed; a lowest floor elevation inspection in flood hazard areas, where an elevation certification must go to the floodplain manager before further vertical construction; framing inspection once the roof, framing, fire-blocking, draft-stopping, bracing, pipes, chimneys and vents are in place; rough-in inspection before any framing, electrical, gas, heating, air conditioning or plumbing work is covered; other inspections the building official deems necessary to confirm code compliance; and a final inspection upon completion of all work and before occupancy.

40(C) requires the department to keep a log of every inspection request with the times and dates made. 27 requires the building permit to stay posted on site, protected from weather, until the permitted work is complete. 41, no new building may be occupied and no change of occupancy may occur until the building and codes division issues a certificate of completion or occupancy after the final inspection, though the building official may issue a temporary certificate valid only for the stated period. 26, though the building official may grant written extensions of up to 180 days each for cause.

Violations & Fines

A civil fine of up to $200 applies to a first violation of chapter 150 under § 150.99(A). A second violation gives the person 7 calendar days to remedy it or submit a correction plan; missing that window brings a civil fine up to $2,000, with each day a separate offense. The county manager or an affected neighboring owner may also seek injunctive relief in court under § 150.99(B).

Frequently Asked Questions

What inspections does York County require during construction?
Seven minimum stages under § 150.40: footing/foundation, concrete slab/under-floor, lowest floor elevation in flood areas, framing, rough-in, any other inspection the building official requires, and a final inspection before occupancy.
Who has to request the inspections?
The permit holder must give the building and codes department reasonable advance notice when work is ready for each stage. The department logs every request with its date and time under § 150.40(C).
What happens if I skip an inspection stage?
A first violation of chapter 150 draws a civil fine up to $200 under § 150.99(A). A second violation gives 7 days to fix it or submit a correction plan before a fine up to $2,000 applies, with each additional day counted separately.
Can I occupy a building before the final inspection?
No. Section 150.41 bars occupancy of a new building or a change of occupancy until the building and codes division issues a certificate of completion or occupancy following the final inspection, unless a temporary certificate is issued.

Sources & Official References

Other rules in York County

All York County rules

Compare York County to another location·View the South Carolina building safety overview

Get notified when Building Inspections in York County, SC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Inspections in Cities Across York County