Maui County, HI Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit basis
Separate permit per building/structure
Application review window
30 days or deemed approved
Permit max life
5 years from issuance
Emergency work filing window
5 business days after start
Building permit prerequisite
Required before plumbing permit (104.4.9)
Governing code
Uniform Plumbing Code, 2018 Edition

Summary

Maui County makes it unlawful to install, alter, repair, or remodel a plumbing system without first getting a separate permit for each building or structure. The 2018 Uniform Plumbing Code, adopted with county amendments, sets narrow exemptions and firm timelines for review, inspection, and permit expiration.

These county ordinances apply to unincorporated areas of Maui County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

104.1 Permits Required. It must be unlawful for a person, firm, or corporation to make an installation, alteration, repair, replacement, or remodel a plumbing system regulated by this code except as permitted in Section 104.2, or to cause the same to be done without first obtaining a separate plumbing permit for each separate building or structure.

Full Breakdown

20C, states it "must be unlawful" to install, alter, repair, replace, or remodel a plumbing system, or cause the same to be done, without first obtaining a separate plumbing permit for each separate building or structure. 2 exempts a short list of minor work: stopping leaks without replacing parts, clearing stoppages without rearranging pipes or fixtures, replacing existing fixtures at their original location, and emergency plumbing work if a permit application is filed within five business days of starting. 6 limits who can receive a permit to a licensed specialty contractor, a county agency's designated master or journey plumber for county projects, or a master or journey plumber working on a dwelling that person owns.

9. 3, a permit expires if the initial inspection is not approved within one year of issuance, and no permit can remain active longer than five years total. 1.

Violations & Fines

Performing plumbing work without the required permit is unlawful under Section 104.1, and Section 104.5.1 charges the applicant the permit fee set in the annual budget ordinance for work commenced before a permit was obtained. If plumbing is covered or concealed before the county has tested, inspected, and approved it, Section 105.2.1 requires the work to be uncovered for inspection after the county issues a notice to uncover, at the responsible person's expense. Miscellaneous inspections not tied to a permit are billed under Section 105.2.2 at a minimum of two hours, and inspections requested outside normal business hours or at distant locations such as Hana, Molokai, and Lanai require the permittee to reimburse the county's added travel and overtime costs.

Frequently Asked Questions

Do I need a permit for plumbing work on my Maui property?
Yes, in almost all cases. Maui County Code Section 104.1 makes it unlawful to install, alter, repair, or remodel a plumbing system without first obtaining a separate plumbing permit for the building or structure, with only a short list of minor exemptions under Section 104.2.
What plumbing work is exempt from a Maui County permit?
Section 104.2 exempts stopping leaks without replacing parts, clearing stoppages without rearranging pipes or fixtures, replacing existing fixtures at their original location, and emergency plumbing work if the permit application is filed within five business days of the work starting.
Can I get a building permit and a plumbing permit at the same time?
The building permit has to come first for above-ground plumbing. Section 104.4.9 states the plumbing permit for above-ground building plumbing will not be issued until a valid building permit has already been issued for the project.
What happens if plumbing is covered up before inspection?
Section 105.2.1 requires it to be uncovered again for inspection after the county issues notice, at the expense of the person responsible, and Section 105.2.1.2 bars putting a plumbing or drainage system into use until it has been tested, inspected, and accepted.

Sources & Official References

Other rules in Maui County

All Maui County rules

Compare Maui County to another location·View the Hawaii building safety overview

Get notified when Plumbing Permits in Maui County, HI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.