Pierce County, WA Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Plumbing code source
Uniform Plumbing Code via WAC Title 51
Local override
Chapter 17C.50 PCC amendments control over state text
Permit fees
Table 17C.10-1-D under PCC 17C.10.070
Unpermitted work investigation fee
$250-$5,000, equal to permit fee
Misdemeanor penalty
Up to $1,000 fine or 90 days jail
Appeal window
14 days to Building Official/Hearing Examiner

Summary

Pierce County plumbs unincorporated properties under the Uniform Plumbing Code as adopted by the Washington State Building Code Council in WAC Title 51, per PCC 17C.50.010, with local amendments in Chapter 17C.50 PCC controlling wherever they conflict with the state text. A permit is required for plumbing work, fees run through the Table 17C.10-1-D schedule, and enforcement follows the same Building Official process as every other Title 17C code.

City-specific rules exist: Lakewood, and Tacoma have their own plumbing permits rules that differ from Pierce County's county-level regulations. If you live in one of those cities, check the city-specific page instead.

The edition of the Uniform Plumbing Code, currently, or hereafter, adopted and amended by the State Building Code Council and included in Title 51 of the Washington Administrative Code, including Appendix Chapters A, B, D, E, I, and L, are adopted as the Plumbing Code for the unincorporated areas of Pierce County; except that the amendments to the Uniform Plumbing Code in this Chapter shall govern over the published provisions of the Plumbing Code. The effective date of subsequent editions of the Uniform Plumbing Code in Pierce County shall coincide with the effective date of their adoption and amendment by the State Building Code Council.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 2026-515, and legislation passed through May 26, 2026).

Full Breakdown

010 adopts whatever edition of the Uniform Plumbing Code the State Building Code Council has currently adopted and amended under Title 51 of the Washington Administrative Code, plus Appendix Chapters A, B, D, E, I, and L, as the plumbing code for unincorporated Pierce County. 50 PCC overrides the published state text where the two conflict, and each new statewide edition takes effect in Pierce County on the same date the State Building Code Council adopts it, with no separate county adoption step required. 040). 080. 090. 060, the Building Official, and then the Hearing Examiner.

Violations & Fines

Plumbing work performed without the required permit is unlawful under PCC 17C.10.050.A, incorporated into the plumbing code at PCC 17C.50.030. It can be charged as a misdemeanor with a fine up to $1,000, up to 90 days in jail, or both, treating each day of continued unpermitted work as a separate offense, or as a civil penalty up to $1,000 per violation, appealable to the Building Official within 14 days.

Frequently Asked Questions

What plumbing code does Pierce County enforce?
Unincorporated Pierce County enforces whichever edition of the Uniform Plumbing Code the Washington State Building Code Council has currently adopted under Title 51 of the Washington Administrative Code, per PCC 17C.50.010, along with Appendix Chapters A, B, D, E, I, and L. Local amendments written into Chapter 17C.50 PCC take priority over the published state text wherever the two conflict.
Do I need a permit for plumbing work in unincorporated Pierce County?
Yes. Permit fees for plumbing work run through Table 17C.10-1-D, billed under PCC 17C.10.070 and referenced at PCC 17C.50.050. Starting plumbing work before the permit issues is unlawful under PCC 17C.10.050 and adds an investigation fee under PCC 17C.10.080 equal to the permit cost, with a $250.00 floor and $5,000.00 ceiling.
How do I appeal a Pierce County plumbing permit decision?
PCC 17C.50.100 routes plumbing appeals to the general Title 17C.10 process: PCC 17C.10.060 lets you appeal a written decision to the Building Official within 14 days at no charge, then to the Pierce County Hearing Examiner under Chapter 1.22 PCC, with any Hearing Examiner appeal fee refunded if the appeal succeeds.

Sources & Official References

Other rules in Pierce County

All Pierce County rules

Compare Pierce County to another location·View the Washington building safety overview

Get notified when Plumbing Permits in Pierce County, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Plumbing Permits in Cities Across Pierce County