Santa Rosa, CA Building Safety: Plumbing Permits (2026)
Key Facts
- Adopted code
- 2025 CA Plumbing Code, Title 24 Part 5
- Local citation
- City Code § 18-24.010
- Sewer connection required
- City Code § 18-24.304.2
- Fixture-swap exemption
- Water-conserving faucets/showerheads, § 18-24.104.2
- Violation penalty
- Gov't Code § 36900, per § 18-24.106.3
Summary
Santa Rosa adopts the 2025 California Plumbing Code by reference, renumbered with an '18-24.' prefix, and requires a permit before plumbing work begins. Every building with plumbing fixtures must connect to a public sewer, an approved private disposal system, or an approved grey water system.
For purposes of citation, all sections of the California Plumbing Code, Title 24, Part 5, 2025 Edition as adopted in Santa Rosa City Code Section 18-04.015, published by the International Association of Plumbing and Mechanical Officials and its IAPMO Installation Standards, and Appendix A, Recommended Rules for Sizing the Water Supply System... as amended by the California Building Standards Commission, as adopted by reference and amended in this Title 18, are renumbered by adding "18-24." before each section number.
Full Breakdown
Chapter 18-24 governs plumbing work. Section 18-24.010 adopts the California Plumbing Code, Title 24, Part 5, 2025 Edition, published by the International Association of Plumbing and Mechanical Officials, including its IAPMO Installation Standards and Appendices A through I, as amended by the California Building Standards Commission, with local sections renumbered by adding '18-24.' before each Plumbing Code section number. A locally added Section 18-24.304.2 requires that every building with plumbing fixtures connect to a public sewer, an approved private sewage disposal system, or an approved grey water disposal system.
The City also amended several administrative sections of the Plumbing Code: plan review fees for plumbing work are set under Section 18-08.030 and additional review fees under Section 18-08.040 (Section 18-24.104.3.2); permit application and plan review expire per the timelines in Section 18-08.050 (Section 18-24.104.3.3); an issued plumbing permit expires per Section 18-08.060 (Section 18-24.104.4.3); and permit fees, including a separate investigation fee equal to the permit fee for work performed without one, follow Section 18-08.130 (Sections 18-24.104.5 and 18-24.104.5.2). A locally added exemption at Section 18-24.104.2 excuses a permit for replacing lavatory and sink faucets, shower heads, water closets, or urinals that meet the City Utilities Department's water conservation standards or Title 20 and Health and Safety Code Section 17921.3 criteria, so long as the work does not require rearranging valves, pipes or fixtures.
Violations & Fines
Section 18-24.106.3 amends Plumbing Code Section 106.3 so that any violation of the plumbing provisions, as locally amended, is punishable under California Government Code Section 36900. Appeals from a Building Official decision on plumbing permits go to the Board of Building Regulation Appeals under Section 18-24.107.1, following the filing procedure and time limits in Section 18-04.065. Plumbing work performed without a permit triggers the citywide investigation-fee rule in Section 18-08.170: a mandatory special investigation plus an added fee equal to the full permit fee, regardless of whether a permit is ultimately issued.
Frequently Asked Questions
What plumbing code does Santa Rosa enforce?
Does every building need a sewer connection in Santa Rosa?
Can I replace a faucet or toilet in Santa Rosa without a plumbing permit?
What happens if I violate the plumbing code in Santa Rosa?
Sources & Official References
Other rules in Santa Rosa
California rules heatmap·Compare Santa Rosa to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.