Tazewell County, IL Building Safety: Plumbing Permits (2026)
Key Facts
- Adopted code
- IL Plumbing Code, 77 Ill. Adm. Code Pt. 890
- Residential fee
- $55 up to 16 fixtures
- Additional fixture fee
- $15 each
- Water heater fee
- $15
- Septic/wells
- routed to Chapter 94, not Ch. 154
- Penalty
- up to $500 per offense/day
Summary
Tazewell County requires a plumbing permit for fixture work in the unincorporated area and enforces the State of Illinois Plumbing Code, 77 Ill. Adm. Code Part 890, adopted by reference under § 154.085. The county's fee schedule charges $55 for up to 16 fixtures and $15 for each additional fixture or a domestic water heater.
§ 154.085 ADOPTED BY REFERENCE. The current State of Illinois Plumbing Code, 77 Ill. Adm. Code Pt. 890, is hereby adopted by reference.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-7: Supplement contains: Local legislation current through Ord. LU-21-12, passed 9-29-2021; and Res. LU-26-09, passed 7-29-2026).
Full Breakdown
085 adopts the current State of Illinois Plumbing Code, 77 Ill. Adm. Code Pt. 001(B) limits that adoption, like the rest of Chapter 154, to areas outside incorporated municipalities. 011(D) defines a FIXTURE broadly to include any device requiring a plumbing connection, listing toilets, wash basins, interceptors, water heaters, bath tubs, sinks, drinking fountains, roughed-in fixtures, urinals, showers, floor drains, and sewage ejectors. 011(B)(4) uses the same $55 base and $15 per-fixture add-on. 011(C) as likely to require a separate electrical and/or plumbing permit on top of the base fee. 001(C) and (D) route those to Chapter 94 instead. 011(E) if it's requested before the 180-day start deadline lapses and the plans haven't changed.
Violations & Fines
Plumbing work that doesn't follow the adopted Illinois Plumbing Code is a Chapter 154 violation under § 154.999(A)(1), a petty offense fined up to $500 per offense with each day of continued noncompliance charged separately. The Community Development Administrator can stop noncompliant plumbing work immediately with a stop work order under § 154.010(C), and the county bills a $75 re-inspection fee when plumbing work isn't ready for a scheduled inspection.
Frequently Asked Questions
What plumbing code applies in unincorporated Tazewell County?
How much is a plumbing permit for a typical house?
Does my septic system need a plumbing permit?
What counts as a fixture for the plumbing fee?
Sources & Official References
Other rules in Tazewell County
Compare Tazewell County to another location·View the Illinois building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.