Broward County, FL Building Setbacks & Zoning: Setback Rules (2026)
Key Facts
- RS-2 front yard
- 50 feet
- RS-3 to RS-6 front yard
- 25 feet
- RM-5 to RM-25 side yard
- 5 feet
- RS-2 rear yard
- 25 feet
- Admin waiver cap
- 10%, max 1 foot (Sec. 39-48)
- Variance resubmission bar
- 12 months after denial
Summary
Every one- and two-family lot in unincorporated Broward's residential districts carries three numeric yard minimums that shrink as density rises. Sections 39-285 through 39-287 set front, side, and rear setbacks by zoning district, from a fifty-foot front yard in the low-density RS-2 district down to eighteen feet in RM-5 through RM-25. An administrative waiver or hearing-officer variance are the only ways to build closer.
Sec. 39-285. - Front yard. (1)Every individual plot used for one-family or two-family dwellings shall maintain a front yard as follows: District Front Yard RS-2 .....50 feet RS-3 to RS-6 .....25 feet RD-4 to RD-6 .....25 feet RD-7 to RD-10 .....18 feet RM-5 to RM-25 .....18 feet ... Sec. 39-286. - Side yards. (1)Every individual plot used for one-family or two-family dwellings shall maintain side yards as follows: District Side Yard RS-2 .....25 feet RS-3 to RS-5, RD-4 to RD-5 .....7.5 feet RS-6, RD-6 to RD-10, RM-5 to RM-25 .....5 feet ... Sec. 39-287. - Rear yard. (1)All individual plots used for one-family or two-family dwellings shall maintain a rear yard as follows: District Rear Yard RS-2 .....25 feet RS-3 to RS-6, RD-4 to RD-5 .....15 feet RD-6 to RD-9, RM-5 to RM-9 .....10 feet RD-10, RM-10 to RM-25 .....5 feet
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 72 | Administrative Code: Supplement 28).
Full Breakdown
Broward's residential setback grid runs by district family rather than a single countywide number. Section 39-285 sets front yards at fifty feet in RS-2, twenty-five feet in RS-3 through RS-6 and RD-4 through RD-6, and eighteen feet in RD-7 through RD-10 and the RM-5 through RM-25 multifamily districts; nonresidential uses on residential land must keep a larger fifty- or thirty-foot street setback, and multifamily buildings of three or more units need a twenty-five-foot street setback. Section 39-286 sets side yards from twenty-five feet in RS-2 down to five feet in RS-6, RD-6 through RD-10, and RM-5 through RM-25, with a separate, larger street-side-yard table for corner lots, plus a zero-lot-line option letting one-family homes sit on a side plot line if the full combined side yard is preserved on the opposite side.
Section 39-287 sets rear yards from twenty-five feet in RS-2 down to five feet in RD-10 and RM-10 through RM-25. These numbers aren't absolute: Section 39-275(3) allows sills, chimneys, eaves and awnings to project thirty-six inches into any required yard, lets an unenclosed patio come within five feet of a non-street plot line (or fifteen feet of the front line), and allows side and rear yards on a one- or two-family lot to shrink to five feet for accessory buildings and uses. An owner who still can't meet the table has two administrative options: Section 39-48 lets the Director waive a setback by up to ten percent, capped at one foot, without a hearing, while Section 39-39(a)(2) authorizes the hearing officer to grant a full variance from the yard tables after weighing the six criteria in Section 39-40, including whether the hardship is self-created and whether the variance is the minimum necessary for reasonable use of the property.
Violations & Fines
A structure built into a required yard without a waiver or variance is enforced under Section 39-10 as a Chapter 39 violation, referable to the County Administrator's designee or the Broward Sheriff's Office and punishable under Fla. Stat. § 125.69. Appeals of a zoning official's setback determination go to the hearing officer within thirty days (Section 39-39(b)), and a denied variance cannot be resubmitted for the same relief on the same property for twelve months (Section 39-43(c)); a granted variance lapses after 180 days if no permit is issued.
Frequently Asked Questions
Can my roof eave hang into the required setback?
Is there a faster fix than a full variance for a small setback shortfall?
What side yard applies to a one-family home in RS-6?
How long does a Broward setback variance stay valid once granted?
Sources & Official References
Other rules in Broward County
Florida rules heatmap·Compare Broward County to another location·View the Florida building setbacks & zoning overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.