Hillsborough County, FL Building Setbacks & Zoning: Structure Height Limits (2026)
Key Facts
- Agricultural districts
- 50 feet maximum in AM, A, AR, AS-0.4, AS-1, ASC-1 and AI
- Single-family and duplex
- 35 feet in RSC-2 through RSC-10, RDC-6 and RDC-12
- Multifamily
- 35 feet in RMC-6 to RMC-12; 45 feet in RMC-16 and RMC-20
- Commercial and office
- 35 feet in O-R and C-N; 50 feet in B-PO, C-G, C-I
- Industrial (M district)
- 110 feet maximum permitted height
- Extra setback over 20 feet
- Two feet per foot of height over 20 (endnote 8)
- I-75 districts
- One extra foot per foot over 30 feet (endnote 15)
Summary
Hillsborough County fixes maximum structure height district by district in the Schedule of Area, Height, Bulk, and Placement Regulations in Land Development Code Sec. 6.01.01. Agricultural districts stop at 50 feet, the single-family and duplex residential districts at 35 feet, and the office, commercial and industrial districts run from 35 feet up to 110 feet in the M district. Tall structures in many districts must also be set back an extra two feet for every foot over 20.
... maximum permitted height of structures, maximum permitted lot coverage, maximum permitted impervious surface and related matters shall be for the districts as shown in the following table: ... AM 871,200 2 871,200 150′ 50′ 25′ 50′ NA NA 50′ NA NA ... RMC-16 5 8,175 3 2,725 7&34 70′ 25′ 10′ 20′ NA NA 45′ 8 40 75 RMC-20 5 6,540 3 2,180 7&34 70′ 25′ 10′ 20′ NA NA 45′ 8 40 75 ... C-G 10,000 NA 75′ 30′ 10&11 10&11 NA .27 29 50′ 8 27 70 C-I 12 20,000 NA 100′ 30′ 10&11 10&11 NA .30 50′ 8 30 75 M 12 20,000 NA 100' 30' 13 10&11 10&11 NA .75 110 8 75 75 ... 8. Structures with a permitted height greater than 20 feet shall be set back an additional two feet for every one foot of structure height over 20 feet. ... 15. For all structures with a height greater than 30 feet, setbacks shall be one additional foot for each foot of structure height over 30 feet. ... 26. Where the building exceeds 65 feet in height, the setbacks from the street shall be one additional foot for each foot of building height above 65 feet.
Full Breakdown
Sec. 6.01.01 is the one table that sets the maximum permitted height of structures for every zoning district in the unincorporated county, alongside minimum lot size, required front, side and rear yards, floor area ratio, lot coverage and impervious surface. The section says these standards are used to establish individual lot standards under a property's zoning, and that a plat or site development plan must demonstrate the project as a whole stays within the gross density the Comprehensive Plan allows. Its history runs through Ord. No. 18-3, effective 1-24-18.
The height column breaks down by district family. The agricultural districts AM, A, AR, AS-0.4, AS-1, ASC-1 and AI are all capped at 50 feet. The single-family and duplex districts RSC-2 through RSC-10 and RDC-6 and RDC-12 are capped at 35 feet, as are the multifamily districts RMC-6, RMC-9 and RMC-12. RMC-16 and RMC-20 rise to 45 feet. In the non-residential column, O-R and C-N are capped at 35 feet, B-PO, C-G and C-I at 50 feet, and the M industrial district at 110 feet. Among the special purpose districts, SPI-AP-3 and AP-4 sit at 35 feet, SPI-AP-5 at 70 feet and SPI-NDM at 40 feet.
Height in this county also pushes buildings away from their neighbors. Endnote 8 is flagged beside the height figure for RMC-9 through RMC-20 and for B-PO, O-R, C-N, C-G, C-I and M. It requires any structure with a permitted height greater than 20 feet to be set back an additional two feet for every one foot of height over 20 feet. A 50-foot C-G building is 30 feet over the threshold, so it carries 60 feet of extra setback, and a 45-foot RMC-16 building carries 50 feet. The extra distance is added to the setbacks or buffers that function as the required rear and side yard, and where no buffer is required between industrial uses, no additional building setback is required. In SPI-AP-1, AP-5 and AP-V the requirement applies only to in-terminal hotels and motels.
The Interstate 75 Planned Development districts use a gentler formula. Endnote 15 requires one additional foot of setback for each foot of structure height over 30 feet, and endnote 26 applies the same one-for-one rule to street setbacks once a building exceeds 65 feet. Endnote 23 sends IPD projects that abut residential development to Sec. 3.02.00 for specific height restrictions.
Violations & Fines
Sec. 6.01.01 prints no fine of its own. It is a development standard applied when a plat, site development plan or building design is reviewed, so a structure drawn above the height listed for its district, or drawn without the two-for-one or one-for-one added setback in endnotes 8, 15 or 26, does not conform to the Schedule. The cure is a redesign: a lower roofline, or a footprint pulled further from the rear and side lines.
Frequently Asked Questions
How tall can a house be in unincorporated Hillsborough County?
Does a taller building need a bigger setback?
What is the tallest structure the Schedule allows?
How do height rules work in the Interstate 75 districts?
Sources & Official References
Other rules in Hillsborough County
Florida rules heatmap·Compare Hillsborough County to another location·View the Florida building setbacks & zoning overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.