Buncombe County, NC Building Setbacks & Zoning: Structure Height Limits (2026)
Key Facts
- Height cap in overlay
- 35 feet
- Overlay triggers
- 2,500 ft elevation, 35% slope
- Min lot size in overlay
- 1.5 acres if >10% overlay area
- Density cap
- 2 units/buildings per lot
- Height measurement
- averaged high/low foundation grade
- Base district height (no overlay)
- 35-90 ft by district
Summary
Homes built inside Buncombe County's Steep Slope/High Elevation Overlay District, land above 2,500 feet with a natural slope of 35 percent or more, are capped at 35 feet of building height under Code Sec. 78-644(f)(3). Lots outside the overlay follow the county's base district height table instead.
(f)Development standards.(1)Lot size standards. Any new lot created with greater than ten percent of the area in the Steep Slope/High Elevation Overlay District after the effective date of this section shall be a minimum of 1.5 acres...(2)Density standards. No more than two dwelling units or two principal buildings or structures per lot of record shall be allowed in the Steep Slope/High Elevation Overlay District.(3)Height standards. The maximum building height in the Steep Slope/High Elevation Overlay District shall be 35 feet.(4)Disturbed and impervious standards.a.The maximum gross site area disturbance allowed in the Steep Slope/High Elevation Overlay District for any single lot, excluding disturbance for installation of individual septic systems, shall be: For lots less than 2.0 acres shall be 0.3 acres. For lots 2.0 acres and larger shall be 15 percent.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 37).
Full Breakdown
Sec. 78-644 establishes the Steep Slope/High Elevation Overlay District to limit development intensity and protect the viewshed on Buncombe County's mountains and hillsides, applying wherever elevation reaches 2,500 feet above sea level and natural slope reaches 35 percent or more, as delineated on the official zoning map. 5 acres for any new lot with more than ten percent of its area inside the overlay, and a density cap of no more than two dwelling units or two principal buildings per lot of record. Building height itself is defined at Sec.
78-581: inside this overlay (and the neighboring Protected Ridge Overlay), height is measured as the average of the vertical distance from the highest ground level at the foundation to the roof's uppermost point and the vertical distance from the lowest ground level at the foundation to that same point, rather than the single highest-point measurement used elsewhere in the county. 0 acres (eight percent on larger lots), and requires downhill-facing walls to be screened with native trees at a ratio tied to the wall's surface area.
Development on slopes over 35 percent, or mapped as high or moderate hazard on the state's Slope Stability Index, additionally requires a geotechnical engineer's report and a global stability analysis before final approval.
Violations & Fines
Building above the 35-foot overlay cap, or disturbing more area than the lot's acreage allows, is a zoning violation under Sec. 78-582. The zoning administrator must serve a written notice of violation before any penalty attaches under Sec. 78-583(a), after which the county can assess a $100.00-per-day civil penalty under Sec. 78-583(d) until the structure or site is brought into compliance, waived if corrected within 30 days. The ruling can be appealed to the board of adjustment under Sec. 78-623.
Frequently Asked Questions
Does Buncombe County limit residential building height everywhere?
How is building height measured on a steep-slope lot?
Is there a minimum lot size in the Steep Slope Overlay?
Are there any exceptions to the county's height limits?
Sources & Official References
Other rules in Buncombe County
Compare Buncombe County to another location·View the North Carolina building setbacks & zoning overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.