Panel Permits
Garden Grove requires a nondiscretionary building permit for any small residential rooftop solar panel system under Chapter 18.56, with online electronic application submittal, an accepted electronic signature, and permit fees capped by state law; systems must meet the size, height, and code-compliance limits in §§18.56.030 and 18.56.040.
Garden Grove Solar Panel Permit Process
Some RestrictionsGarden Grove Municipal Code § 18.56.020(A); § 18.56.030
This chapter applies to the permitting of all small residential rooftop solar energy systems in the City. ... "Small residential rooftop solar energy system" means all of the following: 1. A solar energy system that is not larger than 10 kilowatts alternating current nameplate rating or 30 kilowatts thermal. ... 3. A solar energy system that is installed on a single-or two-family (duplex) dwell...
HOA Restrictions
California's Solar Rights Act (Civil Code Section 714) protects Garden Grove homeowners from HOA rules that prohibit or unreasonably restrict solar panel installations. HOAs may impose only reasonable aesthetic requirements that do not increase system cost by more than $1,000 or reduce efficiency by more than 10%.
Garden Grove HOA Solar Panel Restrictions
Few RestrictionsCalifornia Civil Code Section 714 (Solar Rights Act)
714. (a) Any covenant, restriction, or condition contained in any deed, contract, security instrument, or other instrument affecting the transfer or sale of, or any interest in, real property, and any provision of a governing document, as defined in Section 4150 or 6552, that effectively prohibits or restricts the installation or use of a solar energy system is void and unenforceable. (b) This ...
Expedited Solar Permitting
Garden Grove runs a mandatory expedited, nondiscretionary permit track for small residential rooftop solar under Chapter 18.56, promising a decision within three business days on a complete application and just one field inspection, consistent with the state Solar Rights Act and AB 2188.
Garden Grove Expedited Solar Permitting
Some RestrictionsGarden Grove Municipal Code § 18.56.010; § 18.56.060(C)
The intent and purpose of this chapter is to adopt an expedited, streamlined solar permitting process that complies with the Solar Rights Act and AB2188 (Chapter 521, Statutes 2014, California Government Code Section 65850.5) to achieve timely and cost-effective installations of small residential rooftop solar energy systems. ... For an application that meets the requirements of the approved ch...