Stormwater Management

Mission Viejo bans illicit connections to the storm drain system and any discharge of pollutants to city stormwater channels under Municipal Code Sec. 6.65.200. Violators face notices of noncompliance, cease-and-desist orders, cost recovery invoices, and misdemeanor citations from the city's authorized inspector.

Mission Viejo Stormwater Discharge Rules

Significant Restrictions

Mission Viejo Municipal Code Sec. 6.65.200

No person shall: (1) Construct, maintain, operate and/or utilize any illicit connection. (2) Cause, allow or facilitate any prohibited discharge. (3) Act, cause, permit or suffer any agent, employee, or independent contractor, to construct, maintain, operate or utilize any illicit connection, or cause, allow or facilitate any prohibited discharge. ... A civil or administrative violation of subs...

Erosion Control

Every grading permit in Mission Viejo carries an active erosion-control mandate, not a one-time plan. City Code Sec. 8.10.1310 bars more than 200 cubic yards of rainy-season grading unless an erosion control system is approved or waived by the director, requires desilting basins sized for a 25-year storm, and treats a violation of any state or federal stormwater permit as a violation of the grading chapter itself.

Mission Viejo Grading-Site Erosion Control Rules

Some Restrictions

Mission Viejo Municipal Code Sec. 8.10.1310

(a)Erosion prevention is to be used as the most important measure for keeping sediment on site during construction. Sediment controls are to be used as a supplement to erosion prevention for keeping sediment on site during construction.(c)An effective erosion control system shall be employed to control erosion and provide safety. Applicable erosion control, sediment control, wind erosion, track...

Flood Zones

Mission Viejo requires a development permit before any construction, filling, grading or structure placement in a mapped special flood hazard area. The director of public works, acting as floodplain administrator, reviews plans against the city's 1992 Flood Insurance Rate Map before work can begin.

Mission Viejo Floodplain Development Permit Rules

Some Restrictions

Mission Viejo Municipal Code § 9.100.410

A development permit shall be obtained before construction or development begins within any area of special flood hazards established in section 9.100.320. Application for a development permit shall be made on forms furnished by the floodplain administrator and may include, but not be limited to: plans in duplicate drawn to scale showing the nature, location, dimensions, and elevation of the ar...

Defensible Space

New construction adjoining land with hazardous combustible vegetation in Mission Viejo must meet a fuel modification plan built to Orange County Fire Authority Guideline C-05 before the Fire Code Official signs off. The same Fire Code chapter lets the Fire Code Official require a 10-foot brush clearance along roadways, waivable only for specific hardship reasons.

Defensible Space Fuel Modification in Mission Viejo

Some Restrictions

Mission Viejo Municipal Code § 8.04.150 (Fire Code § 324)

324 Fuel Modification Requirements for New Construction. All new structures and facilities adjoining land containing hazardous combustible vegetation shall be approved and in accordance with the requirements of OCFA Guideline C-05 "Vegetation Management Guideline - Technical Design for New Construction Fuel Modification Plans and Maintenance Program."

Flood Elevation Requirements

New construction and substantial improvements in a Mission Viejo flood hazard area must have the lowest floor, including any basement, built at or above the base flood elevation, with the final elevation certified by a licensed engineer or surveyor before the city signs off.

Mission Viejo Base Flood Elevation Standards

Some Restrictions

Mission Viejo Municipal Code § 9.100.510(3)a

New construction and substantial improvement of any structure shall have the lowest floor, including basement, elevated to or above the base flood elevation. Nonresidential structures may meet the standards in section 9.100.510, subsection (3)b. Upon the completion of the structure, the elevation of the lowest floor, including basement, shall be certified by a registered professional engineer o...