Skip to main content
CityRuleLookup

Water Use Rules in Paramount, CA (2026)

3 verified water use rules for Paramount, California, sourced directly from the municipal code and official government pages.

Verified from official government sources

Turf Replacement Rebates

In the City of Paramount, parkways in the R-1, R-2, R-M, C-3, C-M, M-1 and M-2 zones must be landscaped under Municipal Code § 12.32.050. Live plant materials must cover more than 65% of a residential parkway, and parkway landscaping shall consist of artificial turf or drought tolerant plants. Commercial and industrial parkways must also meet the State Model Water Efficient Landscape Ordinance.

Paramount Parkway Landscaping: Drought Tolerant Plants and Turf

Some Restrictions

Paramount Municipal Code § 12.32.050

In addition, the following regulations shall apply for landscaping of parkways in the R-1 (Single-Family), R-2 (Medium Density), R-M (Multiple-Family), C-3 (General Commercial), C-M (Commercial Manufacturing), M-1 (Light Manufacturing), and M-2 (Heavy Manufacturing) zones: A. All parkways shall be landscaped with live turf, drought tolerant plants, compost, mulch, and artificial turf, or any co...

Recycled Water Rules

In the City of Paramount, a declared Stage 2 Water Supply Shortage requires that only recycled water be used for construction site dust control and consolidation of backfill. Article 5 defines recycled water as the reclamation and reuse of non-potable water for beneficial use, and its watering limits do not apply to recycled water.

Paramount Recycled Water Rule for Construction Dust Control

Some Restrictions

Paramount Municipal Code § 13.04.530

A. A Stage 2 Water Supply Shortage condition exists when the City determines, in its sole discretion, that due to drought or other water supply conditions, a water supply shortage exists and a 20% consumer demand reduction is necessary to make more efficient use of water and appropriately respond to existing water conditions. ... B. Additional Conservation Measures. In addition to the prohibite...

Leak Reporting Duty

In the City of Paramount, once a Stage 1 Water Supply Shortage is declared, every leak, break or other malfunction in a water user's plumbing, distribution or irrigation system must be remedied within 72 hours of observation or notification by the City. Stage 3 cuts that deadline to 48 hours. Irrigation run-off onto a sidewalk, street, gutter or ditch must be repaired within five days.

Paramount Water Leak Repair Deadlines During Shortage

Some Restrictions

Paramount Municipal Code § 13.04.520

A. A Stage 1 Water Supply Shortage condition exists when the City determines, in its sole discretion that due to drought or other water supply conditions, a 10% consumer demand reduction is necessary to make more efficient use of water and appropriately respond to existing water conditions. ... 2. Obligation to Fix Leaks, Breaks or Malfunctions. All leaks, breaks, or other malfunctions in the w...

Looking for Los Angeles County county-wide rules?

County ordinances apply to unincorporated areas and may supplement Paramount city rules.

Water Use Rules in Los Angeles County →