York County, SC Data Centers & Crypto Mining: Crypto Mining Rules (2026)
Key Facts
- Zoning classification
- Treated as a "data center" use
- Crypto mining status
- Expressly included in definition
- Maximum building height
- 80 feet
- Extra setback per foot over district max
- 2 ft side + 2 ft rear per foot
- Allowed districts
- Only specific commercial/industrial districts
Summary
York County regulates cryptocurrency mining as a data center use. It is confined to specific commercial and industrial zoning districts, and a data center building is capped at 80 feet unless the developer adds two extra feet of side and rear setback for every extra foot of height.
DATA CENTER. A facility containing one or more large-scale computer systems, located within a building or group of buildings, used for data storage and processing for off-site users. Key components of a data center include routers, switches, firewalls, storage systems, servers, and application-delivery controllers. Typical supporting equipment includes back-up batteries and/or power generators, cooling units, fire suppression systems, and enhanced security features. This definition includes cryptocurrency mining operations.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-49: Supplement contains: Local legislation current through Ord. 3925, passed 6-16-25).
Full Breakdown
York County's zoning code does not have a stand-alone crypto-mining ordinance; instead, § 155.1301's defined terms fold cryptocurrency mining directly into the "data center" land use. A data center is defined there as "a facility containing one or more large-scale computer systems, located within a building or group of buildings, used for data storage and processing for off-site users," with routers, switches, firewalls, servers, back-up batteries or generators, cooling units, and fire suppression systems called out as typical components, and the definition closes by stating plainly that it "includes cryptocurrency mining operations." That means a crypto mining operation is reviewed and permitted exactly like any other data center.
Table 155.271-2's Use Table lists "Data Centers" as a permitted use only in specific commercial and industrial zoning districts, not across the whole county, so a mining operation cannot simply locate on any commercially zoned lot. Once sited in an eligible district, § 155.058(C) imposes a height-and-setback trade-off: "the maximum building height for a data center is 80 feet, provided that two additional feet of side setback width and rear setback depth above the zoning district minimum is required for each foot of additional height above the district maximum." In practice, a mining facility that wants to build taller than the base district's height limit, up to the 80-foot data center cap, must push its side and rear walls back two extra feet for every foot gained, which limits how tightly a large mining warehouse can be packed onto a commercial or industrial lot near other buildings.
Violations & Fines
Operating a data center or crypto mining facility outside a district where the use is listed as permitted, or exceeding the 80-foot height cap without the required additional setbacks, is a zoning violation under § 155.1236. The Zoning Administrator enforces the use table and setback standards, and a continuing violation is a misdemeanor punishable by a fine of up to $500 per day under § 155.9999.
Frequently Asked Questions
Does York County treat cryptocurrency mining as a separate land use?
How tall can a crypto mining data center be built in York County?
Can a crypto mining facility locate on any commercially zoned lot in York County?
Sources & Official References
Other rules in York County
Compare York County to another location·View the South Carolina data centers & crypto mining overview
See something wrong?