Albemarle County, VA Data Centers & Crypto Mining: Data Center Zoning & Siting (2026)
Key Facts
- Lot-line setback
- 200 feet, all buildings and equipment
- Rural Areas setback
- 500 feet from RA district boundary
- Utilities required
- Public water and public sewer mandatory
- Accessory-use cap
- Support systems under 25% of primary floor area
- Waiver limit
- Accessory-use and utility rules can't be waived
Summary
Albemarle County's zoning ordinance treats data centers as their own use category with dedicated siting rules. Sec. 18-5.1.65 requires every data center to run on public water and public sewer and pushes buildings and equipment well back from neighbors: at least 200 feet from all lot lines and 500 feet from the Rural Areas zoning district, in Albemarle County outside Charlottesville and Scottsville.
B.Minimum development requirements for data centers.1.Data centers must be served by public water and public sewer. ... C.Setbacks—Data center buildings and all associated equipment and accessory structures (such as generators, HVAC, and battery backup) must be set back at least (i) 200 feet from all lot lines and (ii) 500 feet from the Rural Areas zoning district.
Full Breakdown
Sec. 65 draws a sharp line between accessory data centers and standalone facilities. A data center only qualifies as an accessory use, exempt from the section's siting standards, if it sits on the same site as a permitted primary use, is operated by that site's own user for its own data, and its footprint together with its support systems stays under 25 percent of the primary use's gross floor area; that accessory-use test cannot be waived by special exception under subsection (E). Any data center that does not meet that test is a standalone use subject to Sec.
65(B) and (C) in full: it must be served by public water and public sewer, a requirement that likewise cannot be waived or modified by special exception, and any water-based cooling must run on a closed loop or recycled system. Setbacks are substantial and apply to the building itself along with every piece of associated equipment, including generators, HVAC units, and battery backup: at least 200 feet from every lot line on the site, and at least 500 feet from the boundary of the Rural Areas zoning district, which covers most of the county's unincorporated land outside its designated development areas. Generator operations under subsection (D) layer additional noise and scheduling limits on top of these siting standards.
Violations & Fines
Siting or operating a data center without meeting the public water and sewer, setback, or accessory-use standards of Sec. 18-5.1.65 is a zoning violation under Sec. 18-36.1. The Zoning Administrator can issue a civil summons of $200.00 for a first violation and $500.00 for each additional one from the same facts, up to $5,000.00 total, or refer the matter for prosecution as a Class 1 misdemeanor under Sec. 18-36.4, punishable by $10.00 to $1,000.00 per day.
Frequently Asked Questions
How far must a data center be from the property line in Albemarle County?
Can a data center use a private well or septic system in Albemarle County?
When is a data center exempt from these siting standards?
Sources & Official References
Other rules in Albemarle County