Paulding County, GA Data Centers & Crypto Mining: Data Center Zoning & Siting (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Overlay size
~995 acres, 12 tax parcels
Minimum lot
50 acres
Max building coverage
50% of lot
Max height
75 feet
Minimum setbacks
75 ft front/side/rear
Parking
3 spaces per 1,000 sq ft office space

Summary

Paulding County only allows large-scale data centers inside its Technology Park Overlay District, a fixed set of tax parcels totaling roughly 995 acres. Section 220-40.01 sets the district's purpose, while Sections 220-40.04 and 220-40.05 fix a 50-acre minimum lot, a 50 percent building-coverage cap and a 75-foot height limit for qualifying developments.

These county ordinances apply to unincorporated areas of Paulding County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

220-40.01 Purpose and Intent. The purpose and intent of the Technology Park Overlay District that allows the siting of "Data Centers" in designated areas of 50 acres or greater in size, which Data Centers may include computers and data center equipment, data storage and hosting technologies, and other new technologies, under certain conditions set by the County. The conditions of this Technology Park Overlay District are established to ensure the availability of adequate water and electrical utility resources, set-backs, buffer areas, noise levels and noise attenuation methods, screening, security, and protection of adjacent and nearby uses from adverse impacts. ... 220-40.04 Lot Size, Area and Setback Requirements. A.Minimum Lot Acreage: 50 acresB.Building Coverage Limit: 50% maximum total building coverage as a percent of total lot area ... 220-40.05 Height Regulations. Buildings shall not exceed a height of 75 feet, measured from structure pad level.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 35).

Full Breakdown

01, 'to allow the siting of Data Centers in designated areas of 50 acres or greater in size,' covering computers, data storage and hosting technology under conditions meant to secure adequate water and electrical utility capacity, setbacks, buffers, noise attenuation and screening. 02 fixes the overlay to twelve specific tax parcels totaling roughly 995 acres, and the Board of Commissioners may only redraw that boundary through the Chapter 280 rezoning procedure. 03 permits uses such as computing infrastructure, data processing, web hosting, custom computer programming and public utilities alongside accessory power and cooling equipment.

06), and caps building coverage at 50 percent of the lot. 05 limits building height to 75 feet measured from the pad, though the Community Development Director can approve taller incidental elements such as water towers or HVAC equipment on a showing of technical necessity. 08 if built to county road standards.

Violations & Fines

Locating a data center outside the mapped ~995-acre overlay, undercutting the 50-acre minimum lot or 75-foot setbacks, or exceeding the 75-foot height cap without the Community Development Director's sign-off is a Title 2 zoning violation the Zoning Administrator can cite. Boundary expansion requires a formal Chapter 280 rezoning, not administrative approval, and an administrative enforcement decision may be appealed to the Zoning Board of Appeals within 30 days under Section 290-40.01.

Frequently Asked Questions

Can a data center be built anywhere in Paulding County?
No. Section 220-40.01 confines large data centers to the Technology Park Overlay District, a fixed set of tax parcels totaling about 995 acres; a site outside that boundary would need a full rezoning under Chapter 280 before a data center use could be considered.
How big does the lot have to be?
Section 220-40.04 sets a 50-acre minimum lot size for the Technology Park Overlay District, along with 150 feet of public road frontage, a 110-foot minimum lot width at the building line, and 75-foot setbacks on every side of the property.
How tall can a data center building be?
Section 220-40.05 caps building height at 75 feet measured from the pad, though the Community Development Director may approve taller incidental features like water towers, generators or HVAC equipment if the applicant shows a technical or mechanical need for the extra height.

Sources & Official References

Other rules in Paulding County

All Paulding County rules

Compare Paulding County to another location·View the Georgia data centers & crypto mining overview

Get notified when Data Center Zoning & Siting in Paulding County, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.