Key Facts

Zoning mechanism
Planned Unit Development rezoning required
Precedent case
Skybox Old Settlers PUD25-00009
Size cap
250,000 sq ft, one building
Power cap
75 megawatts grid-interconnected power
Cooling rule
Closed-loop cooling system mandatory

Summary

Round Rock has no by-right zoning category for data centers; siting requires a case-by-case Planned Unit Development rezoning approved by City Council, as seen in the 250,000-square-foot Skybox PUD.

Only one data center building may be constructed. It is limited to 250,000 square feet in floor area, 60 feet in height, and 75 megawatts of grid-interconnected power. The proposed data center must use a closed-loop cooling system, which is written into the planned unit development (PUD) as a binding requirement.

Full Breakdown

Round Rock's base zoning code does not list "data center" as a permitted or conditional use, so operators must rezone through a Planned Unit Development that City Council negotiates project-by-project. The precedent-setting Skybox Old Settlers PUD (PUD25-00009) converted 29.69 acres from Light Industrial to PUD, capping the site at one data center building, 250,000 square feet, 60 feet in height, and 75 megawatts of grid-interconnected power, while mandating closed-loop cooling and limiting on-site generators to emergency, testing, and utility-managed load-shedding use. City Council gave final approval February 12, 2026, after months of public hearings.

Violations & Fines

Building without an approved PUD rezoning, or exceeding the negotiated caps on floor area, height, or power draw, or running generators outside the permitted emergency/testing/load-shedding uses violates the binding PUD conditions the city enforces.

Frequently Asked Questions

Can a data center be built by right in Round Rock?
No. The base zoning code has no data center use category, so any project needs a City Council-approved Planned Unit Development rezoning, as required for the Skybox Old Settlers site.
What limits apply to the approved Skybox data center?
One building capped at 250,000 square feet, 60 feet tall, and 75 megawatts, with mandatory closed-loop cooling and generators restricted to emergency, testing, and load-shedding use.

Sources & Official References

Other rules in Round Rock

All Round Rock rules

Texas rules heatmap·Compare Round Rock to another location·View the Texas data centers & crypto mining overview

Get notified when Data Center Zoning & Siting in Round Rock, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Data Center Zoning & Siting in Nearby Cities

How other cities in Williamson County handle data center zoning & siting.

Cedar Park, TX
Some Restrictions