Key Facts
- Data centers named in
- § 162.02, definition of SIMILAR PROJECTS
- Who decides applicability
- Director of Engineering and Planning, at application
- Zoning district
- District S-P, Site Plan, under § 160.051
- Application fee
- $5,000, in addition to other permit fees
- BESS site spacing
- 1,500 feet from another BESS site
- Single-family or school setback
- At least 200 feet for a perimeter fence
Summary
Chapter 162 of the Texas City Code of Ordinances, written for battery energy storage systems, defines similar projects to include data centers and similar high energy demand installations, with applicability decided by the Director of Engineering and Planning at application. Covered uses are restricted to District S-P, Site Plan, with a $5,000 application fee.
SIMILAR PROJECTS. ... Data centers and similar high energy demand installations which may or may not return energy to the grid. Applicability of this chapter shall be determined by the Director of Engineering and Planning at the time of application. ... (A) BESS facilities and similar uses shall be restricted to locations zoned in accordance with Chapter 160 - "Zoning," § 160.051, District S-P - Site Plan. ... (B) A BESS site shall be no closer than 1,500 feet perpendicular in any direction from another BESS site measured at the perimeter fence. This distance may be increased or reduced by the City Commission upon recommendation from the Planning Board and Zoning Commission.
Full Breakdown
Ord. 2025-06, passed August 6, 2025, created Chapter 162 to regulate Battery Energy Storage System (BESS) and similar project sites. Section 162.02 defines SIMILAR PROJECTS as data centers and similar high energy demand installations which may or may not return energy to the grid, and provides that applicability of the chapter is determined by the Director of Engineering and Planning at the time of application. Data centers are named nowhere else in the code as exported, and crypto mining is not named at all, so this chapter is the only place a data center is addressed.
Section 162.03(A) restricts BESS facilities and similar uses to locations zoned District S-P, Site Plan, under Section 160.051. Section 160.051(C)(1)(b)14 adds that the basic district most closely comparable to these projects is District F, Light Industrial, but that site-specific review under District S-P is required in all districts, including District F. The Planning Board and Zoning Commission and the City Commission each have broad discretion over the development and its intended use and operation. Section 162.03(B) requires installations to be unmanned and prohibits on-site office or shop facilities, while allowing equipment storage and maintenance facilities that are not permanently attended.
Section 162.04 requires a Development Plan filed with the Engineering and Planning Department with a $5,000 application fee, in addition to fees for zoning change, platting, building permits or certificates of occupancy. The plan must include a site plan showing distances to adjacent property lines and structures, a landscaping and screening plan, elevations and renderings, and a reimbursement agreement for the city's third party expert.
Section 162.05 sets location standards written for BESS sites: BESS sites no closer than 1,500 feet to another BESS site, a perimeter fence setback of at least 200 feet from the nearest property zoned for single-family uses or a school, and no installation in a FEMA designated Special Flood Hazard Area. Because the chapter's spacing and setback text speaks of BESS sites, the Director's applicability decision determines how these numbers apply to a data center proposal.
Violations & Fines
Chapter 162 prints no penalty section of its own. Its stated consequences run through permitting and occupancy: a deferral of platting requirements under Section 162.05(K), or of landscaping under Section 162.07(F), that is not satisfied in an acceptable timeframe can result in revocation or non-renewal of the Certificate of Occupancy for the site. Section 162.21 requires 30 days written notice to the Engineering and Planning Department before a change in ownership, and the applicant remains liable for the approved Development Plan conditions.
Frequently Asked Questions
Does Texas City regulate data centers by name?
What zoning district does a data center need in Texas City?
What does the application cost?
Are there distance requirements from homes or schools?
Is there a data center moratorium in Texas City?
Sources & Official References
Other rules in Texas City
Texas rules heatmap·Compare Texas City to another location·View the Texas data centers & crypto mining overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.