Key Facts

Allowed zone
Industrial (IND) only, not Manufacturing
Capacity cap
10 to 50 megawatts maximum
Minimum lot size
5 acres in IND zone
Height limit
8 feet minimum, 60 feet maximum
Lot coverage cap
60% of buildings and structures
Residential buffer
IND zone barred next to residential zones
Governing ordinance
Ord. 2025-1292-O, effective 5-6-2025

Summary

Washington County confines any data, AI, or crypto center to its Industrial (IND) zone, never the adjoining Manufacturing (MFG) zone, and hard-caps every facility at 10 to 50 megawatts; the code states plainly that larger capacity facilities are not permitted. A qualifying site needs a 5-acre minimum lot, and the IND zone itself cannot sit next to any residential, forest residential, agricultural, estate, or open-space zone.

These county ordinances apply to unincorporated areas of Washington County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Data, AI, crypto center (10 MW to 50 MW maximum. Larger capacity facilities not permitted.) ... MFG IND Minimum new lot area 40,000 sf 5 acres Maximum lot area 10 acres 20 acres Min/Maximum Height of Any Building or Structure 8'/40' 8'/60' Maximum Lot Coverage 60% 60% Front, side or rear setback adjacent to any R, FR, RA, RE, SFR, OSC or OST zone or property 40 feet IND not permitted

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-17: Code current through: Ord. 2026-1329-O, passed 8-18-2026).

Full Breakdown

County Code § 10-11-2's Manufacturing and Industrial Use Chart lists "Data, AI, crypto center (10 MW to 50 MW maximum. )" as a permitted use, and the "P" mark sits only in the IND column, not the MFG column, so a data center cannot locate on Manufacturing-zoned ground. Section 10-11-3's Area, Setback and Height Requirements table then sets the IND zone's dimensional envelope: a 5-acre minimum new lot, a 20-acre maximum lot, and a height cap of 8 feet minimum up to 60 feet maximum for any building or structure, with maximum lot coverage of all buildings and structures held to 60%.

Street frontage must run at least 140 feet. The same table bars an IND-zoned front, side, or rear setback from touching any R, FR, RA, RE, SFR, OSC, or OST zone or property outright, printed as "IND not permitted," compared with a 40-foot buffer allowed for the Manufacturing zone. § 10-11-5 further requires that any manufacturing or industrial use, building permit, or certificate of occupancy application include an accurate site plan, a listing of all buildings within 200 feet and waterways or wells within 500 feet, architectural plans, sewage and waste engineering plans, traffic and onsite parking plans, the proposed fuel and energy source, and shift and employee counts. These standards were adopted by Ord. 2022-1215-O and most recently amended by Ord. 2025-1292-O, effective May 6, 2025.

Violations & Fines

Section 10-11-2 states any use "not specifically permitted, permitted with standards, or conditionally permitted is prohibited," so an unpermitted data center use, or one built past the 50-megawatt cap, is a zoning violation. Under § 10-1-12 the county building inspector and public works director enforce Title 10; § 10-1-18 lets an inspector issue a stop-work "red tag" on noncompliant construction, and § 10-1-11 lets the county attorney sue to abate the use as a public nuisance.

Frequently Asked Questions

Can a data center be built in Washington County's Manufacturing zone?
No. County Code § 10-11-2's use chart marks the data, AI, or crypto center entry as permitted only in the Industrial (IND) column; the Manufacturing (MFG) column carries no permitted mark for that use, so an MFG-zoned parcel cannot host one regardless of size.
What is the biggest data center Washington County will allow?
50 megawatts. Section 10-11-2 caps every data, AI, or crypto center at 10 to 50 MW and states that larger capacity facilities are simply not permitted, with no variance path described in that section.
Can an IND-zoned data center site sit next to a residential neighborhood?
No. The § 10-11-3 setback table lists the IND zone's front, side, or rear setback next to any R, FR, RA, RE, SFR, OSC, or OST zone as "IND not permitted," an outright adjacency ban rather than a distance requirement.
What must a data center operator submit before breaking ground?
Under §§ 10-11-1 and 10-11-5, the applicant must file an initial performance standards analysis and, with the county's building or zone-change application, a site plan, utility proof, sewage and waste engineering plans, traffic plans, and the proposed fuel and energy source; the county may hire outside experts at the applicant's expense to verify compliance.

Sources & Official References

Other rules in Washington County

All Washington County rules

Compare Washington County to another location·View the Utah data centers & crypto mining overview

Get notified when Data Center Zoning & Siting in Washington County, UT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Data Center Zoning & Siting in Cities Across Washington County