Horry County, SC Environmental Rules: Erosion Control (2026)
Key Facts
- Plan required
- Sediment and erosion control plan with every stormwater permit
- Section
- Horry County Code § 17.7-47(f)
- Standard
- Must match SCDHEC's construction general permit (CGP)
- Linear projects
- >1,000 ft need a detailed plan plus SWPPP (§17.7-46(9))
- Banned discharges
- Concrete/stucco washout, fuels, oils, solvents (§17.7-46)
- Inspections
- Owner runs CGP erosion-control inspections (§17.7-76(j))
Summary
Every stormwater permit application in unincorporated Horry County must include a sediment and erosion control plan built to the state's construction general permit standard. Code § 17.7-47(f) requires the plan before ground is disturbed, and § 17.7-46 bans discharges like concrete washout and fuel spills from any construction site.
(f)Sediment and erosion control plan. A sediment and erosion control plan consistent with the most recent version of SCDHEC's construction general permit (CGP) must be submitted with all stormwater permit applications. All erosion/sediment control practices details, vegetative stabilization details and standard notes shall be included. The Horry County Stormwater Design Manual includes specific requirements for inclusion in the sediment and erosion control plan.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 88).
Full Breakdown
Horry County folds its erosion-control rules into the same stormwater ordinance rather than a stand-alone chapter. 7-47(f) requires that "a sediment and erosion control plan consistent with the most recent version of SCDHEC's construction general permit (CGP) must be submitted with all stormwater permit applications," including "all erosion/sediment control practices details, vegetative stabilization details and standard notes," and the county's own Stormwater Design Manual adds specific content requirements on top of the state template. " The same section separately bans specific construction-site discharges outright: washout water from concrete, stucco, paint, curing compounds and other construction materials; fuels, oils and other vehicle-maintenance pollutants; and soaps or solvents used to wash equipment, unless the washout is captured by an approved control such as a sediment basin.
7-76(j) puts the burden of routine inspection on the owner, who must run on-site erosion-control inspections under the CGP with a certified inspector and keep those reports available to the county on request. 7-88.
Violations & Fines
Failing to follow an approved sediment and erosion control plan draws a written notice of violation from the stormwater department describing the deficiency and the correction deadline under § 17.7-51; missing that deadline brings a stop-work order within seven days. The underlying violation of Article III is punished under the general penalty, § 1-8, up to a $500 fine or 30 days in jail, separate from any state CGP enforcement by SCDHEC.
Frequently Asked Questions
Do I need a separate erosion-control permit in Horry County?
Can I wash out a concrete truck on a Horry County job site?
What extra erosion-control paperwork applies to a long pipeline or road project?
Who inspects erosion controls once construction starts?
Sources & Official References
Other rules in Horry County
Compare Horry County to another location·View the South Carolina environmental rules overview