Key Facts

Governing law
Chatham County Code Ch. 24, Art. VIII
Stream/marsh buffer
25 feet, undisturbed
Max daily penalty
$2,500 per day
Max jail term
60 days
Bond cap
$3,000 per acre
First violation
Written warning, 5 days to fix

Summary

Chatham County requires an erosion, sedimentation and pollution control plan for land-disturbing activity, with best management practices meeting state manual standards. A 25-foot undisturbed buffer applies along state waters and coastal marshlands. Violations draw stop-work orders and fines up to $2,500 per day.

These county ordinances apply to unincorporated areas of Chatham County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

There is established a 25 foot buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action... No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed state of vegetation until all land-disturbing activities on the construction site are completed.

Full Breakdown

Under the county's Soil Erosion and Sedimentation Control Ordinance (Code of Chatham County Chapter 24, Article VIII), any land-disturbing activity not otherwise exempt must be covered by an erosion, sedimentation and pollution control plan built on best management practices meeting the minimum requirements of Sec. " Plans must address stripping of vegetation, cut-fill operations, topography, disturbed-area duration and stabilization timing. Sec. 24-804(2)(b) establishes a 25-foot buffer along the banks of all state waters, measured from the point vegetation has been wrested by normal stream flow, and a separate 25-foot buffer along coastal marshlands measured from the marshland-upland interface under the Coastal Marshlands Protection Act of 1970.

No land-disturbing activity is allowed inside a buffer, and it must stay in its natural, undisturbed vegetative state until the site achieves final stabilization; a variance from the County Engineer/Director can permit narrower protection only if it is at least as protective. Permit applicants who have had two or more prior violations within three years can be denied a permit, and the county may require a bond of up to $3,000 per acre before issuing one, forfeitable if the site is not brought into compliance.

Enforcement runs through the County Engineer, who issues notices of violation, written warnings, and stop-work orders: a first or second violation gets a 5-day warning to correct before a stop-work order issues, while a third or subsequent violation, an imminent threat to public health or state waters, or unpermitted work triggers an immediate stop-work order.

Violations & Fines

Sec. 24-807 makes any violation of the ordinance, permit condition, or Director's order punishable by up to 60 days in jail, a monetary penalty of up to $2,500 per day, or both; municipal, magistrate or other courts of competent jurisdiction may impose the $2,500 cap per violation, and each day a violation continues counts as a separate offense. Working without a required land-disturbing permit can also trigger revocation of the violator's business license or work permit.

Frequently Asked Questions

Do I need an erosion control plan to build in Chatham County?
Yes, if your project is land-disturbing activity not otherwise exempt under Sec. 24-803. The plan must meet the minimum best-management-practice requirements of Sec. 24-804(2) and (3) before Chatham County or the Soil and Water Conservation District will approve a land-disturbing permit.
How close to a creek can I disturb land in Chatham County?
Not within 25 feet of the bank of any state water, measured from where vegetation has been wrested by normal stream flow, per Sec. 24-804(2)(b) of the county's Soil Erosion and Sedimentation Control Ordinance. The buffer must stay undisturbed until the site reaches final stabilization.
What happens if I disturb land without a permit in Chatham County?
The County Engineer can issue an immediate stop-work order without a warning period, and Sec. 24-807 exposes you to revocation of your business or work license plus a fine of up to $2,500 per day of violation, or up to 60 days in jail, or both.

Sources & Official References

Other rules in Chatham County

All Chatham County rules

Compare Chatham County to another location·View the Georgia environmental rules overview

Get notified when Erosion Control in Chatham County, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.