Key Facts

Applies to
Commercial and industrial zoning districts
Governing section
Zoning Ordinance Sec. 21-41, § 41.6
Enforcing office
Lake County Planning Director
Noncompliance result
Minor or major use permit required
Agricultural exemption
Grazing, crop/tree farming, apiaries, aviaries
Sediment control tool
Sediment/debris/desilting basins or silt traps

Summary

Commercial and industrial development in unincorporated Lake County must limit exposed soil, preserve natural drainage features, and install sediment basins under Zoning Ordinance Section 41.6. The Planning Director can require a technical report proving compliance before any zoning clearance or use permit issues.

These county ordinances apply to unincorporated areas of Lake County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

41.6 Erosion control: The following erosion control standards shall apply to all development projects in commercial or industrial zoning districts: (a) The smallest practical area of land shall be exposed at any one time during development. (b) When land is exposed during development, the exposure shall be kept to the shortest practical period of time. (c) Natural features such as trees, groves, natural terrain, waterways, and other similar resources shall be preserved where feasible. (d) Temporary vegetation and/or mulching shall be used to protect critical areas exposed during development. (e) The permanent final vegetation and structures shall be installed as soon as practical in the development. (f) Wherever feasible the development shall be fitted to the topography and soils to create the least erosion potential. (g) Provisions shall be made to effectively accommodate the increased runoff caused by changed soil and surface conditions during and after development. (h) Sediment basins (debris basins, desilting basins, or silt traps) shall be installed and maintained to remove sediment from runoff waters from land undergoing development where needed.

Full Breakdown

Article 41 of the Lake County Zoning Ordinance (Sec. " The standard is not a single number but an eight-part checklist: the smallest practical area of land may be exposed at any one time; any exposure period must be kept as short as practical; natural features such as trees, groves, natural terrain and waterways must be preserved where feasible; temporary vegetation or mulching must protect critical areas during construction; permanent vegetation and structures must go in as soon as practical; the development must be fitted to topography and soils to minimize erosion potential; runoff increases from changed soil and surface conditions must be accommodated; and sediment basins, debris basins, desilting basins or silt traps must be installed and maintained where needed to remove sediment from construction runoff.

2, the Planning Director may demand a report from a qualified technical consultant showing the project will meet these standards before issuing any ministerial or discretionary approval, and required field measurements must be taken at the exterior lot lines. 6 at the time of zoning clearance must instead obtain a use permit, and the Planning Director decides whether a minor or major use permit applies based on the project's characteristics, with a major use permit mandatory if the noncompliant use could significantly impact the environment, create substantial public controversy, or injure public health, safety or welfare.

6 entirely. 3(c) makes clear these are floor standards only: the Review Authority may impose stricter erosion controls as a condition of any discretionary approval.

Violations & Fines

A commercial or industrial project that fails to meet Section 41.6's erosion controls cannot receive a zoning clearance as a ministerial matter; instead Section 41.3(a) forces the applicant into a minor or major use permit process, with the Planning Director deciding which tier applies. Projects found to risk significant environmental impact, substantial public controversy, or injury to public health, safety or welfare are pushed into the major use permit track, which brings public hearing and appeal exposure under later articles of Chapter 21.

Frequently Asked Questions

Does Lake County's erosion control rule apply to residential building?
Section 41.6 by its own text applies to "development projects in commercial or industrial zoning districts." It does not set a residential-district erosion standard, so residential projects are handled through other permit and grading review rather than this section.
Can the county require a soils or erosion report before approving a project?
Yes. Section 41.2(a) lets the Planning Director require information, including a report from a qualified technical consultant, demonstrating compliance with performance standards like Section 41.6 before issuing any ministerial or discretionary approval.
What happens if a commercial project can't meet the erosion standards?
Section 41.3(a) requires the project to obtain a use permit instead of proceeding on zoning clearance alone. The Planning Director decides between a minor or major use permit, with major review triggered by significant environmental impact, public controversy, or health and safety risk.
Are farms exempt from Section 41.6?
Yes. Section 41.3(b) exempts livestock grazing, crop and tree farming, animal husbandry, apiaries and aviaries from Section 41.6's erosion control requirements, along with several other performance standard sections.

Sources & Official References

Other rules in Lake County

All Lake County rules

California rules heatmap·Compare Lake County to another location·View the California environmental rules overview

Get notified when Erosion Control in Lake County, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.