Cobb County, GA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Applies to
Unincorporated Cobb County land disturbance
Turbidity limit (warm-water)
25 NTU above baseline
Turbidity limit (trout waters)
10 NTU above baseline
Governing standard
Manual for Erosion and Sediment Control in Georgia

Summary

Cobb County requires best management practices on all land-disturbing activity in the unincorporated area, and treats stormwater discharge that raises receiving-water turbidity above set limits as a separate daily violation.

City-specific rules exist: Acworth has its own erosion control rules that differ from Cobb County's county-level regulations. If you live in Acworth, check the city-specific page instead.

A discharge of stormwater runoff from disturbed areas where best management practices have not been properly designed, installed and maintained shall constitute a separate violation of any land disturbing permit issued by Cobb County pursuant to O.C.G.A. § 12-5-30(f), the Georgia Water Quality Control Act, for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for waters supporting warm water fisheries or by more than ten nephelometric turbidity units for waters classified as trout waters.

Source: Municode LibraryView official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 53).

Full Breakdown

Under Code § 50-75(b), any land disturbance not exempted under § 50-74 must apply erosion and sedimentation control best management practices meeting the Manual for Erosion and Sediment Control in Georgia. A discharge from an inadequately designed, installed, or maintained BMP is a separate violation for each day it raises receiving-water turbidity above 25 nephelometric turbidity units in warm-water fisheries, or above 10 NTU in trout waters, enforced under the county's NPDES general permit and O.C.G.A. § 12-5-30(f).

Violations & Fines

Each day of noncompliant discharge is a separate violation of the land disturbing permit; Code § 50-78 sets penalties, and BMP failure can trigger stop-work orders and permit revocation.

Frequently Asked Questions

Does Cobb County require erosion control on construction sites?
Yes - unincorporated Cobb County requires best management practices for erosion and sedimentation control on all non-exempt land-disturbing activity under Code § 50-75, following the state erosion control manual.
What turbidity level violates Cobb County's erosion rules?
A discharge that raises receiving-water turbidity more than 25 NTU (warm-water fisheries) or 10 NTU (trout waters) above baseline is a separate violation for each day it occurs.

Sources & Official References

Other rules in Cobb County

All Cobb County rules

Compare Cobb County to another location·View the Georgia environmental rules overview

Get notified when Erosion Control in Cobb County, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Cities Across Cobb County