San Mateo County Planning & Building Department requires submittal of an Erosion and Sediment Control Plan prior to issuance of any demolition, grading, or building permit that involves site disturbance. Standard BMPs include silt fencing, straw wattles, erosion control blankets, stabilized construction entrances, and covered stockpiles. Wet-season work (October 1 - April 30) triggers additional inspection requirements and may be restricted on steep slopes. SWPPP required for sites 1+ acre.
The County's erosion control requirements implement NPDES MRP Provision C.6 (Construction Site Controls) and state Construction General Permit (SWRCB Order 2022-0057-DWQ) for sites 1+ acre. An Erosion and Sediment Control Plan (ESCP) must be submitted with building permit applications for any project involving ground disturbance. Required BMPs per the County ESC Manual: silt fence along downslope property perimeter, straw wattles on contour for sheet flow control, stabilized construction entrance (rock pad) to prevent tracking onto roads, gravel bag checks in swales, erosion control blankets on disturbed slopes, inlet protection at storm drain catch basins, stockpile covers. Wet-season work (Oct 1 - Apr 30) requires enhanced inspections and stabilization before each storm event; active grading on slopes steeper than 3:1 may be restricted. Disturbed areas must be stabilized (via vegetation, hydroseed, or mulch) within 14 days of disturbance cessation. Final stabilization with 70% vegetation cover or paved/landscaped finish is required before project closeout. Steep-slope projects may also trigger Geotechnical Review. Pre-site inspections for erosion control and tree protection are now required on specific site types.
Missing/inadequate ESC: stop-work order and fines $250-$2,500 per County Code. Sediment discharge to waterway: RWQCB enforcement $1,000-$25,000 per day plus cleanup cost. Failure to stabilize within 14 days: daily fines until corrected. Violating Construction General Permit: SWRCB penalties up to $10,000/day plus $10/gallon.
Daly City, CA
Daly City prohibits nuisance barking under Title 6 (Animals) and Chapter 9.22 (Disturbing the Peace). Owners must prevent dogs from habitually barking or how...
Daly City, CA
Construction with a valid city permit is allowed weekdays 8 AM to 8 PM in Daly City. Weekend and holiday construction hours are more restricted. Unpermitted ...
Daly City, CA
Daly City regulates noise under Chapter 9.22 (Disturbing the Peace). Residential sound limits are 60 dBA daytime and 50 dBA nighttime. The general quiet peri...
Daly City, CA
Daly City restricts overnight and extended parking of large commercial vehicles in residential zones. California Vehicle Code provisions on commercial vehicl...
Daly City, CA
Daly City prohibits parking RVs, boats, trailers, and camper shells in the front yard of residential lots. They may only be parked on the driveway within app...
Daly City, CA
Daly City enforces California Vehicle Code Β§22651 for abandoned vehicles (72 hours on public street). Street sweeping parking restrictions are posted by bloc...
Side-by-side rule comparisons with other cities in San Mateo County.
See how Daly City's erosion control rules stack up against other locations.
Help us keep this page accurate. If you notice an error or outdated information, let us know.