Dougherty County, GA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit threshold
1 acre or more disturbed
Enforcing agency
Dougherty County Public Works Department
Plan must be sealed by
PE licensed in Georgia
Application review time
15 business days
Civil penalty
$50 to $5,000 per day
Permit expires if unstarted
180 calendar days
Advance notice of construction
5 working days

Summary

In unincorporated Dougherty County, disturbing one acre or more of land, or a smaller tract that is part of a larger development plan, requires a land disturbance permit from the Dougherty County Public Works Department backed by an engineer-sealed erosion and sediment control plan. Violators face civil penalties of $50 to $5,000 per day of violation.

These county ordinances apply to unincorporated areas of Dougherty County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(a)Permit required. ... Every person will be required to obtain a land disturbance permit from the Dougherty County Public Works Department in the following cases:(1)Land disturbing activity disturbs one (1) or more acres of land;(2)Land disturbing activity of less than one (1) acre of land if such activity is part of a larger common plan of development that affects one (1) or more acre of land ... The plan shall be sealed by a registered professional engineer (PE) licensed in the State of Georgia. A copy of the erosion and sediment control plan and any required permit, by this chapter, shall be available at the project site at all times. ... (b)Penalties. Any person violating the provisions of this chapter may be assessed a civil penalty by the Dougherty County Public Works Department of not less than fifty dollars ($50.00) and not more than five thousand dollars ($5,000.00) per day for each day of violation. Each day of violation shall constitute a separate violation.

Full Breakdown

5 (stormwater management) requires a land disturbance permit before grading begins whenever activity disturbs one acre or more, is a smaller phase of a larger common plan affecting one acre or more, or, at the Public Works Department's discretion, poses a unique threat to water or public health. Borrow pits also need one. No building or occupancy permit issues until the land disturbance permit is obtained. An application must include a sediment and erosion control plan, a stormwater management concept plan, a maintenance agreement, and a nonrefundable review fee, and Public Works must approve or deny a complete application within 15 business days.

5-5(i), must be sealed by a professional engineer licensed in Georgia, must be kept at the project site at all times, and must cover 17 specific items: project description, a topographic map with contours of 10 feet or less, existing drainage ways and floodways, tree preservation, clearing and grading limits, pre- and post-construction runoff flows, proposed sediment control improvements, and a phased sequence of construction. The plan must also conform to the county's Soil Erosion and Sedimentation Control Resolution No. 01-032. A land disturbance permit expires if work has not started within 180 days or is not finished within 18 months, and the applicant must notify Public Works five working days before construction starts so inspections can be scheduled.

Violations & Fines

Under section 2-14.5-92, anyone who violates chapter 2-14.5, breaches a permit condition, or ignores a written notice to correct a violation commits a civil offense. The Dougherty County Public Works Department may assess a civil penalty of not less than $50 and not more than $5,000 per day, with each day of violation counted separately. The county can also recover damages, investigation costs, and the cost of maintaining stormwater facilities an owner failed to maintain, and it may sue to enjoin an ongoing violation; these remedies are cumulative, not exclusive.

Frequently Asked Questions

Do I need a land disturbance permit for a small lot?
Not automatically. The threshold in section 2-14.5-3 is one acre or more, but a smaller tract still needs a permit if it is part of a larger common plan of development affecting an acre or more, or if Public Works decides the activity poses a unique threat to water or public health.
Who reviews erosion and sediment control plans in unincorporated Dougherty County?
The Dougherty County Public Works Department reviews the application, the sediment and erosion control plan, and the maintenance agreement, and it must approve or deny a complete application within 15 business days under section 2-14.5-3(e).
What happens if I disturb land without the required permit?
You are committing a civil offense under section 2-14.5-92 and can be fined between $50 and $5,000 for every day the violation continues, on top of any damages and enforcement costs the county recovers and any injunction it obtains.
Does the erosion control plan need an engineer's seal?
Yes. Section 2-14.5-5(i) requires the sediment and erosion control plan to be sealed by a professional engineer licensed in Georgia, and a copy of the plan and any required permit must stay at the project site at all times.

Sources & Official References

Other rules in Dougherty County

All Dougherty County rules

Compare Dougherty County to another location·View the Georgia environmental rules overview

Get notified when Erosion Control in Dougherty County, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.