Skip to main content
CityRuleLookup

Multnomah County, OR Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Permit trigger
any ground disturbing activity
MIP permit fill cap
under 10 cubic yards
Stormwater system trigger
500+ sq ft impervious surface
Design storm standard
10-year, 24-hour event
Applies to
unincorporated county only

Summary

Unincorporated Multnomah County requires a permit before any ground disturbing activity, and a stormwater drainage system once new or replaced impervious surface tops 500 square feet.

City-specific rules exist: Gresham, and Portland have their own erosion control rules that differ from Multnomah County's county-level regulations. If you live in one of those cities, check the city-specific page instead.

Unless exempt under this Code, whether under MCC 39.6215, 39.5080, 38.5510 or otherwise, no ground disturbing activity shall occur except pursuant to one of the following permits: a Minimal Impact Project (MIP) permit, an Erosion and Sediment Control permit (ESC), an Agricultural Fill permit (AF), a Geologic Hazards permit (GH), or a Large Fill permit (LF). ... Persons creating new or replacing existing impervious surfaces exceeding 500 square feet shall install a stormwater drainage system as provided in this section.

Full Breakdown

MCC § 39.6210(A) bars ground disturbing activity without a Minimal Impact Project, Erosion and Sediment Control, Agricultural Fill, Geologic Hazards, or Large Fill permit, whichever fits the scope. The Minimal Impact Project tier covers small jobs: under 10,000 sq ft disturbed, under 10 cubic yards of fill, pre-development slopes of 10% or less, and finished unsupported slopes under 33% and under 4 feet tall (§ 39.6220(B)(1)-(4)). Separately, § 39.6235(A) requires a stormwater drainage system for any new or replacement impervious surface over 500 square feet (roof/shingle replacement excepted), sized so 10-year, 24-hour storm runoff at the property line doesn't exceed pre-development rates. This governs only unincorporated county land. Portland, Gresham, Troutdale, Fairview, and Wood Village enforce their own grading and stormwater codes.

Violations & Fines

The planning director can stop work on-site if inspection finds erosion exceeding permit limits, and no certificate of occupancy or final approval issues until all ground disturbing and stormwater requirements are satisfied (MCC § 39.6210(F)(2), (G)).

Frequently Asked Questions

Does this apply inside Portland?
No. Portland has its own grading and stormwater code; MCC Chapter 39 governs only unincorporated county land.
Do I need a permit for a small garden project?
Residential gardening under 5,000 sq ft and landscape maintenance under 10,000 sq ft are exempt if 100+ feet from a watercourse (MCC § 39.6215(G)).

Sources & Official References

Other rules in Multnomah County

All Multnomah County rules

Compare Multnomah County to another location·View the Oregon environmental rules overview

Get notified when Erosion Control in Multnomah County, OR changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Cities Across Multnomah County