Grays Harbor County, WA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Stormwater standard
Stormwater Management Manual for Western Washington
Dry season clearing window
May 1 to October 1
Required plan
erosion and sediment control plan (§18.06.570)
Civil penalty
up to $1,000 per day
Criminal penalty
up to $1,000 fine or 90 days
Enforcing office
Planning and Building / code enforcement

Summary

Unincorporated Grays Harbor County requires erosion and sediment control on every development in a mapped erosion or landslide hazard area. Stormwater and drainage work must follow the Stormwater Management Manual for Western Washington, disturbed soil must be stabilized with practices such as mulching and geotextiles, and grading is limited to the amount the project actually needs, under Grays Harbor County Code § 18.06.580.

These county ordinances apply to unincorporated areas of Grays Harbor County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

B.Uses, structures, and activities in erosion hazard areas shall meet the following performance standards:1.On-site stormwater and drainage development shall meet the requirements of the current edition of the Stormwater Management Manual for Western Washington.2.Minimize modification of the natural contour of slopes by conforming to the existing topography of the site. ... 8.Reduce clearing, grading, and impervious surfaces to the minimum amount necessary to accommodate the project permit. ... F.Clearing activities that disturb soils in erosion and landslide hazard areas are allowed during the dry season from May 1 to October 1; provided, however, that the county may extend or shorten the dry season on a case-by-case basis or upon recommendation of a qualified professional.

Full Breakdown

Chapter 18.06.580 sets the performance standards that apply to any use, structure or clearing activity in a designated erosion hazard area within unincorporated Grays Harbor County. On-site stormwater and drainage work must meet the current edition of the Stormwater Management Manual for Western Washington, the same manual the Washington Department of Ecology issues for construction sites statewide. Builders must minimize modification of the natural slope contour, incorporate stabilization best management practices such as temporary and permanent seeding, mulching, geotextiles, sod stabilization, vegetative buffer strips and preservation of mature vegetation, and stabilize every exposed or disturbed soil surface promptly.

The standards also require minimizing removal of existing vegetation and undergrowth, designing cut and fill slopes to cut erosion, stabilizing conveyance outlets and stream banks, and reducing clearing, grading and impervious surface to the minimum the permit actually needs. Clearing that disturbs soil in an erosion or landslide hazard area is confined to the dry season, May 1 through October 1, though the administrator can extend or shorten that window case by case or on a qualified professional's recommendation. Section 18.06.570(A)(3) separately requires any development proposal on a site with an erosion hazard to submit a written erosion and sediment control plan, prepared to the same Stormwater Management Manual standard, as part of the critical area report before the county will act on the permit. Timber harvest clearing follows an approved forest practices permit instead of these seasonal limits.

Violations & Fines

Unauthorized clearing or grading in an erosion hazard area triggers a stop-work order under § 18.06.290, and the county can require a restoration plan, prepared by a qualified professional, at the violator's expense before work resumes. Chapter 17.96 backs that with a civil penalty of up to $1,000 per day of violation and a misdemeanor charge of up to $1,000, 90 days in jail, or both, with each day counted separately.

Frequently Asked Questions

What erosion control standard applies to construction in unincorporated Grays Harbor County?
Any project on a site with a mapped erosion hazard must follow the performance standards in Grays Harbor County Code § 18.06.580(B): stormwater and drainage that meet the Stormwater Management Manual for Western Washington, stabilization best management practices like mulching, geotextiles and seeding, and clearing and grading held to the minimum the project needs.
Is there a season when I can't clear or grade a hazard-area site?
Clearing that disturbs soil in an erosion or landslide hazard area is limited to the dry season, May 1 through October 1, under § 18.06.580(F). The administrator can extend or shorten that window case by case, or on a qualified professional's recommendation, and timber harvest clearing instead follows an approved forest practices permit.
Do I need a written erosion and sediment control plan?
Yes. Section 18.06.570(A)(3) requires a written erosion and sediment control plan, built to the Stormwater Management Manual for Western Washington, for any development proposal on a site containing an erosion hazard area, submitted as part of the critical area report before the county acts on the permit.
What happens if I skip the erosion control requirements?
The county can issue a stop-work order under § 18.06.290 and order restoration at your expense. Chapter 17.96 adds a civil penalty of up to $1,000 per day and a misdemeanor charge of up to $1,000, 90 days in jail, or both, with each day of continuing violation a separate offense.

Sources & Official References

Other rules in Grays Harbor County

All Grays Harbor County rules

Compare Grays Harbor County to another location·View the Washington environmental rules overview

Get notified when Erosion Control in Grays Harbor County, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.