High Point, NC Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit trigger
Land disturbance over 1 acre
Plan due
30 days before work starts
Reviewed by
Engineering Services Director
Small-project exemption
Additions under 1,000 sq ft
Design storm
10-year storm (25-year in HQW)

Summary

No one may start land-disturbing work in High Point exceeding 1 acre, or meeting other triggers like highly erodible soils, without a City-approved soil erosion and sedimentation control plan and a land disturbance permit issued under Development Ordinance § 2.5.10.

Unless exempted by this section, no person shall initiate any land-disturbing activity without a soil erosion and sedimentation control plan and a land disturbance permit in accordance with Section 2.5.10, Land Disturbance Permit, if the land-disturbing activity: (a) Exceeds 1 acre (lands under one ownership or diverse lands being developed as a unit shall be aggregated)...

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 9 | Development Ordinance: Supplement 14).

Full Breakdown

Section 6.3.1 triggers the erosion-control requirement for land disturbance exceeding 1 acre, sites on highly erodible ('k' factor over 0.36) soils, work draining into a water quality pond, or activity in Tier 1/2 watershed critical areas. Small exemptions cover additions, accessory structures, and accessory dwelling units under 1,000 square feet of disturbance (§ 6.3.2.H), plus emergency, agricultural, and forestry work. The plan must be sealed by a licensed engineer, landscape architect, CPESC, or surveyor for sites 1 acre or larger, filed with the Planning and Development Director and the Soil and Water Conservation District at least 30 days before work begins, and reviewed within 30 days by the Engineering Services Director.

Violations & Fines

Land-disturbing activity without an approved plan, or work that deviates from an approved plan, is a violation; the Engineering Services Director can order a stop-work order and require restoration of affected waters and land.

Frequently Asked Questions

How big does a project have to be before High Point requires an erosion control plan?
Generally over 1 acre of land disturbance, though smaller sites on highly erodible soils or near water quality structures can also trigger the requirement under § 6.3.1.
How long does High Point have to review an erosion control plan?
The Engineering Services Director has 30 days to approve, conditionally approve, or deny a complete plan; missing that deadline results in automatic approval.

Sources & Official References

Other rules in High Point

All High Point rules

Compare High Point to another location·View the North Carolina environmental rules overview

Get notified when Erosion Control in High Point, NC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in this county handle erosion control.

Greensboro, NC
Some Restrictions