Imperial County, CA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Imperial County Code Sec. 91011.00
Permitting authority
County engineer
Key exemption
Agricultural land leveling
Issuance limit
Can't take land out of ag use
Appeal window
10 days to Board of Supervisors

Summary

Imperial County requires a county-engineer grading permit for excavation or earthwork in the unincorporated area, but exempts routine agricultural land leveling.

These county ordinances apply to unincorporated areas of Imperial County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

No person, firm, association, corporation or organization except public entities and their officers, employees or contractors who are performing work within publicly owned rights-of-way, shall, within the unincorporated territories of the County of Imperial, do any grading, excavation or earthwork construction without having first obtained a permit therefore from the county engineer.B.This Chapter does not apply to performing the following work:1.Grading in an isolated, self-contained area, provided there is no danger to the public, and that such grading will not adversely affect adjoining properties.2.Cemetery graves.3.Excavation authorized by a valid building permit.4.Construction of irrigation and drainage appurtenances.5.Agricultural land leveling. (Ord. No. 1565, § 8, 12-15-20)

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 62 - 9-25).

Full Breakdown

Section 91011.00 bars grading, excavation or earthwork construction without a permit from the county engineer, applying countywide except within public rights-of-way. The chapter carves out five exceptions, including isolated grading that won't endanger the public or affect neighbors, cemetery graves, excavation already covered by a building permit, irrigation and drainage construction, and, notably for the Imperial Valley's farm economy, agricultural land leveling. Where a permit is required, Section 91011.02 lets the engineer issue it only if the grading won't take irrigable land out of agricultural use, won't block drain tile, and won't cut below the local water table.

Violations & Fines

Grading without a permit is unlawful under Section 91011.05 and subject to citation; a denied or conditioned permit can be appealed to the Board of Supervisors within ten days under Section 91011.03.

Frequently Asked Questions

Does leveling my farm field need a county grading permit?
No. Section 91011.00(B)(5) exempts agricultural land leveling from the grading permit requirement.
Who issues grading permits in unincorporated Imperial County?
The county engineer, who can only approve a permit if it won't make irrigable land unfit for farming or interfere with drain tile or the water table, per Section 91011.02.

Sources & Official References

Other rules in Imperial County

All Imperial County rules

California rules heatmap·Compare Imperial County to another location·View the California environmental rules overview

Get notified when Erosion Control in Imperial County, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.