Madera County, CA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Max cut slope
1:1
Max fill slope
1 1/2:1
Preferred grading window
May 1 - Nov 30
Sediment control
Basins/traps required at clearing start

Summary

Construction and grading projects in unincorporated Madera County must retain sediment on site and hold cut slopes to 1:1 and fill slopes to 1 1/2:1 under the county's drainage and erosion control standards.

These county ordinances apply to unincorporated areas of Madera County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

A.Sediment Control. Sediment shall be retained on the site. Sediment basins, sediment traps, or similar sediment control measures shall be installed at the time of clearing and grading operations. ... E.Slope Construction. Cuts shall be no steeper than 1:1 and fills shall be no steeper than 1½:1 unless soil conditions indicate a different slope is necessary for stability. Erosion control measures shall be specified to provide stabilization.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 52).

Full Breakdown

Madera County Code § 14.50.080 sets the erosion and sediment control standards attached to a grading permit. Sediment basins or traps must be installed at the start of clearing and grading, native vegetation must be retained and protected where possible, and cut slopes may be no steeper than 1:1 with fill slopes no steeper than 1 1/2:1 unless soil conditions require otherwise. Grading should run May 1 through November 30 where possible, with more stringent controls required from December through April. Fill placed near a watercourse needs erosion protection, and material likely to wash into a river or stream cannot be stored there.

Violations & Fines

Violating the erosion-control standards or a grading permit's conditions is a misdemeanor under § 14.50.120, with each day a separate offense, and the county engineer can issue a stop-work order until the site is brought into compliance.

Frequently Asked Questions

How steep can a cut slope be on a Madera County grading project?
No steeper than 1:1 for cuts and 1 1/2:1 for fills under § 14.50.080(E), unless soil conditions require a gentler slope.
Is there a preferred season for grading in Madera County?
Yes: operations should run May 1 through November 30, with stricter erosion controls required outside that window.

Sources & Official References

Other rules in Madera County

All Madera County rules

California rules heatmap·Compare Madera County to another location·View the California environmental rules overview

Get notified when Erosion Control in Madera County, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Cities Across Madera County