Skip to main content
CityRuleLookup

Odessa, TX Environmental Rules: Erosion Control (2026)

Light Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Governing law
City Code Article 13-7, Div. 2
Permit required
NPDES or TPDES stormwater permit
Local step
File NOI copy with Development Dept.
Covers
Sites disturbing one acre or more
Penalty
Class C misdemeanor, up to $500

Summary

Odessa requires an NPDES or TPDES stormwater discharge permit for construction sites, plus a copy of the notice of intent filed with the city's Development Department before the site starts disturbing land.

The operator of a facility, including construction sites, required to have a NPDES or TPDES permit to discharge stormwater associated with industrial activity shall submit a copy of the notice of intent (NOI) to the director at the same time the operator submits the original notice of intent to the EPA or the TCEQ as applicable.

Full Breakdown

Under Article 13-7 of the Odessa Code of Ordinances, any site with stormwater discharges tied to industrial activity, including construction activity, must operate under a valid NPDES or TPDES permit before work begins (§13-7-31, §13-7-33). When the operator files its notice of intent (NOI) with the EPA or the Texas Commission on Environmental Quality, a copy must also go to Odessa's Development Department at the same time (§13-7-34). The Development Director administers the article, can inspect sites, and can order a deficient stormwater pollution prevention plan (SWPPP) fixed within 30 days (§13-7-2, §13-7-36).

Violations & Fines

Discharging construction stormwater without an NPDES/TPDES permit, or without filing the local NOI copy, is an offense under Article 13-7 and punishable as a Class C misdemeanor with a fine up to $500 under the code's general penalty section.

Frequently Asked Questions

Does Odessa have its own erosion-control permit for construction?
No separate city permit exists; Odessa instead requires the state NPDES/TPDES stormwater permit and a copy of the notice of intent filed with its Development Department (City Code §13-7-31, §13-7-34).
What size project triggers Odessa's construction stormwater rule?
Construction disturbing one acre or more of land, or part of a larger common plan of development, counts as industrial activity requiring permit coverage under City Code §13-7-1.
Who enforces this in Odessa?
The city's Development Department director administers Article 13-7, inspects sites, and can require SWPPP corrections within 30 days (City Code §13-7-2, §13-7-36).

Sources & Official References

Other rules in Odessa

All Odessa rules

Texas rules heatmap·Compare Odessa to another location·View the Texas environmental rules overview

Get notified when Erosion Control in Odessa, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.