Knox County, TN Environmental Rules: Erosion Control (2026)
Key Facts
- Governing sections
- Sec. 26-251 and 26-252, Knox County Code
- Applies to
- All land-disturbing activity, even plan-exempt work
- Design standard
- State NPDES construction general permit
- Conflict rule
- Stricter standard controls
- Bond release
- Only after final site stabilization
Summary
Any construction or land-disturbing activity in unincorporated Knox County, even work exempt from a stormwater plan, must run erosion prevention and sediment control under Sec. 26-251 to stop off-site sedimentation. Sec. 26-252 ties the required best management practices to the state's NPDES construction general permit and the county's own stormwater manual, whichever standard is stricter.
In keeping with [this] section, adequate erosion prevention and sediment control measures shall be employed consistent with guidance materials referenced herein for all land disturbing activities, including those exempted in section 26-171 to minimize erosion and prevent off-site sedimentation. Land disturbing or construction activities that do not employ erosion prevention and sediment controls and cause off-site sedimentation or sediment discharges to waters of the state or onto adjacent properties may be subject to enforcement. (Sec. 26-251) ... (a)Operators shall implement appropriate erosion prevention and sediment control best management practices. (Sec. 26-252(a))
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 23).
Full Breakdown
Sec. 26-251, part of the county's Division 5 erosion prevention and sediment control rules, requires "adequate erosion prevention and sediment control measures" on all land-disturbing activities, including projects exempted from filing a full stormwater management plan under Sec. 26-171, specifically to keep sediment from leaving the site or reaching state waters. Operators failing to install controls and causing off-site sedimentation are subject to enforcement. Sec. 26-252 spells out how: design, installation, maintenance and inspection must follow the State of Tennessee NPDES General Permit for construction stormwater, the TDEC erosion and sediment control handbook, and the county's own stormwater management manual, and wherever these conflict, the stricter standard controls.
Sites discharging into impaired or exceptional Tennessee waters, and "priority construction activities," face additional requirements, and the director can demand more stringent controls where a threatened or endangered species' habitat is at risk. Sediment basin and trap discharges must run through a pipe or a rip-rap-lined spillway so they do not cause erosion, and sediment-laden water pumped from excavations must be held in a settling basin or filtered before release, discharged only onto a stabilized outlet point. Construction site operators must also control other construction wastes, such as discarded building material, concrete truck washout and sanitary waste, that could harm water quality.
The erosion-control portion of a project's performance bond is released only after the site reaches final stabilization under the state general permit, and the director can hold it longer or demand extra measures on a priority site or one with a history of off-site sediment damage.
Violations & Fines
Land-disturbing or construction work that skips required erosion and sediment controls and causes off-site sedimentation or a discharge to state waters "may be subject to enforcement" under Sec. 26-251, which routes into the stormwater ordinance's penalty scheme: civil penalties of $250.00 to $5,000.00 per day under Sec. 26-157, plus stop-work orders and withheld permits.
Frequently Asked Questions
Do small projects skip erosion control requirements?
What standards govern erosion control design in Knox County?
When is my erosion-control performance bond released?
Sources & Official References
Other rules in Knox County
Compare Knox County to another location·View the Tennessee environmental rules overview