Alpine, TX Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Residential lowest floor
- At or above base flood elevation, basement included
- Who certifies residential
- Registered professional engineer, architect or land surveyor
- Nonresidential option
- Elevate, or floodproof so the structure is watertight below base flood level
- Enclosure openings
- Two openings, one square inch per square foot enclosed, within one foot of grade
- Shallow flooding default
- At least two feet above highest adjacent grade if no depth number
- Manufactured home piers
- No less than 36 inches above grade (existing parks)
Summary
In Alpine, new homes and substantial improvements in mapped flood hazard areas must have the lowest floor, basement included, at or above the base flood elevation, certified by an engineer, architect or land surveyor. Nonresidential buildings can instead be floodproofed.
In all areas of special flood hazards where base flood elevation data has been provided as set forth in section 50-34 , section 50-62 (8) and section 50-88 (c), the following provisions are required: (1) Residential construction. New construction and substantial improvement of any residential structure shall have the lowest floor (including basement) elevated to or above the base flood elevation. A registered professional engineer, architect or land surveyor shall submit a certification to the floodplain administrator that the standard of this subsection as proposed in subsection 50-63 (a)(1), is satisfied. (2) Nonresidential construction. New construction and substantial improvements of any commercial, industrial or other nonresidential structure shall either have the lowest floor (including basement) elevated to or above the base flood level or, together with attendant utility and sanitary facilities, be designed so that below the base flood level the structure is watertight with walls substantially impermeable to the passage of water ...
Full Breakdown
Section 50-87 sets the specific elevation standards wherever base flood elevation data has been provided under §§ 50-34, 50-62(8) and 50-88(c). Residential construction must have the lowest floor, including any basement, elevated to or above the base flood elevation, and a registered professional engineer, architect or land surveyor must certify to the floodplain administrator that the standard is satisfied. A new or substantially improved nonresidential structure has two options: elevate the lowest floor to or above the base flood level, or make the structure watertight below that level with walls substantially impermeable to water and components able to resist hydrostatic and hydrodynamic loads and buoyancy. The floodproofing design needs an engineer or architect, and the floodplain administrator keeps a record of the certification showing the specific elevation, in relation to mean sea level, to which the structure is floodproofed.
A substantial improvement is any reconstruction, rehabilitation, addition or other improvement whose cost equals or exceeds 50 percent of the structure's market value before the work starts, and it includes structures that incurred substantial damage.
Fully enclosed areas below the lowest floor that are used solely for parking, building access or storage must let floodwaters in and out. Unless an engineer or architect certifies the design, the enclosure needs a minimum of two openings with a total net area of not less than one square inch for every square foot of enclosed area, and the bottom of every opening can be no higher than one foot above grade. Manufactured homes in zones A1-30, AH and AE sit on a permanent foundation with the lowest floor at or above base flood elevation, or in certain existing parks on piers no less than 36 inches above grade. Recreational vehicles must be on site fewer than 180 consecutive days, be fully licensed and ready for highway use, or meet the permit, elevation and anchoring rules. In shallow flooding areas, § 50-89 requires the lowest floor above the highest adjacent grade at least as high as the FIRM depth number, and at least two feet if no number is specified.
Violations & Fines
Chapter 50 has no penalty clause of its own, so the general penalty in § 1-11 applies: a fine not exceeding $500.00, or $2,000.00 for ordinances governing fire safety, zoning or public health and sanitation, with each day a separate offense. A variance to build with the lowest floor below base flood elevation requires good and sufficient cause and exceptional hardship, and the applicant receives written notice that flood insurance cost will match the increased risk (§ 50-64(j)).
Frequently Asked Questions
How high must a new house in an Alpine flood zone be built?
Can a commercial building be floodproofed instead of elevated?
What applies where the maps show shallow flooding?
What is required for openings in a flood enclosure?
Sources & Official References
Other rules in Alpine
Texas rules heatmap·Compare Alpine to another location·View the Texas environmental rules overview