El Dorado County, CA Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Governing section
- County Code § 130.32.050
- Residential floor standard
- At or above BFE
- Certification required by
- Registered civil engineer/surveyor
- New SFHA lots
- Prohibited entirely in SFHA
- Cumulative rise limit
- No more than 1 ft BFE increase
Summary
In Special Flood Hazard Areas, El Dorado County requires new and substantially improved residential structures to have their lowest floor, including any basement, built at or above the base flood elevation shown on FEMA's flood insurance rate maps.
Residential Construction. All new and modern construction and substantial improvement of any residential structure shall have the lowest floor, including basement:(1)In A1-A9, A14 and A24 Zones, at or above the base flood elevation (BFE);(2)In an A zone, without BFEs specified on the FIRM (unnumbered A zone), at or above the base flood elevation.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 13 Update 4).
Full Breakdown
040(B)(2). Manufactured and mobile homes, and temporary mobile home/RV units placed under a hardship permit, must be elevated on a permanent foundation to the same BFE standard and securely anchored to resist flotation, collapse and lateral movement; before foundation or set-up inspection is approved, a registered civil engineer or licensed land surveyor must certify the lowest-floor elevation, and a County building inspector must certify the structure is properly elevated, or the County issues a stop-work order. 050(A)(3)(b) must meet the same elevation standard or be floodproofed and certified watertight by a registered civil engineer or architect.
040) reviews every development permit in a SFHA to confirm these elevation certifications are on file and that cumulative development will not raise the base flood elevation more than one foot anywhere in the County. 4.
Violations & Fines
Failing to submit the required elevation certification before foundation approval is cause for the Director to issue a stop-work order under Section 130.32.050(A)(3)(a). Broader code violations are enforced as remedial action by the Floodplain Administrator under Section 130.32.040(B)(6), referencing the general compliance provisions of Section 130.32.030(B); building permits cannot be issued relying on a Conditional Letter of Map Revision, and structures with enclosed areas below the BFE that are converted to living space without a recorded non-conversion agreement are subject to Floodplain Administrator inspection on 72 hours' notice.
Frequently Asked Questions
How high above flood level must a new house be built in El Dorado County?
Who certifies the elevation before construction proceeds?
Can I create a new lot entirely inside the flood hazard area?
What if my garage floor sits below the base flood elevation?
Sources & Official References
Other rules in El Dorado County
California rules heatmap·Compare El Dorado County to another location·View the California environmental rules overview