Eugene, OR Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Governing sections
- EC 9.6705-9.6709
- Residential freeboard
- 1 ft above Base Flood Elevation
- No-data elevation
- 2 ft above highest adjacent grade
- Permit trigger
- Any development in mapped flood hazard area
- Substantial damage threshold
- 50% of pre-damage market value
- Code currency
- Ord. 20684 (2023); code current through Ord. 20739, June 2026
Summary
Eugene requires new residential construction in special flood hazard areas to elevate the lowest floor at least one foot above Base Flood Elevation, and requires a development permit before any construction begins in a mapped floodplain, under EC 9.6705-9.6709.
New construction, conversion to, and substantial improvement of any residential structure shall have the lowest floor, including basement, elevated to a minimum of one (1) foot above the Base Flood Elevation (BFE). When no base flood elevation data is available, the reasonably safe elevation requirement for development proposals with an elevation requirement, within a riverine unnumbered a zone, is at least two (2) feet above the highest adjacent grade.
Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 20739, passed June 8, 2026).
Full Breakdown
6709. 6706 requires a development permit before any construction or development begins in a mapped flood hazard area, covering structures, manufactured homes, fill, and other activities, with applications required to show elevations relative to mean sea level and, for land divisions of 5 acres or 50 lots or more, Base Flood Elevation (BFE) data. a: new construction, conversion, or substantial improvement of a residential structure must have its lowest floor, including basement, elevated to a minimum of one foot above BFE, or at least two feet above the highest adjacent grade where no BFE data exists.
6707(2)(c)3. 6707(2)(a). 6709 allows variances only on lots of a half-acre or less surrounded by existing structures built below base flood level, requires a showing of good and sufficient cause and a finding of exceptional hardship, and mandates written notice to the applicant that building below BFE raises flood insurance premiums and risk to life and property. These provisions were repealed and replaced by Ordinance No. 20684, enacted March 8, 2023, effective April 14, 2023; the Eugene Code is current through Ordinance No. 20739, passed June 8, 2026.
Violations & Fines
EC 9.6708(5) makes it a violation to construct, locate, extend, convert, or alter any structure or land without full compliance with EC 9.6705-9.6709, including any conditions or safeguards attached to a development permit. Violations are enforced through the code enforcement provisions at EC 9.0020-9.0280. Substantial-damage determinations trigger the same compliance duty: EC 9.6708(2)(b) treats a structure as substantially damaged, and therefore subject to full floodplain rebuilding standards, once repair costs reach 50 percent or more of the structure's pre-damage market value.
Frequently Asked Questions
How high above flood level must a new house be built in Eugene?
Do I need a permit to build in a Eugene floodplain?
Can a non-residential building skip the elevation requirement?
When can a property owner get a variance from the flood elevation rules?
Sources & Official References
Other rules in Eugene
Compare Eugene to another location·View the Oregon environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.