Fort Collins, CO Environmental Rules: Flood Elevation Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Poudre River freeboard
24 inches above base flood elevation
New construction, FEMA/City basins
18 inches above base flood elevation
Additions & accessory structures
12 inches above base flood elevation
Enforcing office
Utilities Executive Director
Required before occupancy
FEMA elevation certificate, surveyor-signed
Violation penalty
Misdemeanor, up to $2,650 fine, 180 days jail

Summary

Fort Collins requires the lowest floor and all mechanical equipment of new construction, additions, substantial improvements, and redevelopment in a mapped flood hazard area to sit above the base flood elevation itself, not at it. The added cushion, called the regulatory flood protection elevation, runs 24 inches above base flood elevation along the Poudre River and 12 to 18 inches in FEMA and City basin floodplains under Municipal Code Section 10-37.

(b)Requirement to elevate. In any flood hazard area, the duct work, heating, ventilation and air conditioning systems, hot water heater, electrical and the lowest floor level of any structure in the event of any new construction, addition, substantial improvement or repair of substantial damage, or redevelopment must be elevated to or above the applicable regulatory flood protection elevation...(c)Determination of regulatory flood protection elevation. The regulatory flood protection elevation shall be determined as follows:(1)Poudre River floodplain:a.Twenty-four (24) inches above the base flood elevation;(2)FEMA basin and City basin floodplains:a.For new construction and redevelopments, eighteen (18) inches above the base flood elevation;b.For additions and substantial improvements, twelve (12) inches above the base flood elevation; andc.For accessory structures, twelve (12) inches above the base flood elevation;

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Municipal Code: Supplement 155 | Transitional Land Use Code (for project before May 17, 2024): Supplement 61 | Traffic Code: Supplement 27).

Full Breakdown

Section 10-37 of the Fort Collins Municipal Code sets the City's freeboard standard for every structure built, added to, substantially improved, or redeveloped inside a designated flood hazard area under Chapter 10, Article II. The base flood elevation for a parcel is the higher of the elevation shown on the FEMA Flood Insurance Rate Map or the elevation from the City's own floodplain delineation adopted under Section 10-19(b); where no base flood elevation is mapped for an AO zone, the code defaults to 24 inches above the highest adjacent grade.

Elevation is then layered on top of that number. Ductwork, HVAC systems, the hot water heater, electrical equipment, and the lowest floor must be raised to or above the regulatory flood protection elevation for any new construction, addition, substantial improvement, repair of substantial damage, or redevelopment. The amount of freeboard depends on the floodplain and the type of work: 24 inches above base flood elevation anywhere in the Poudre River floodplain; 18 inches above base flood elevation for new construction and full redevelopments in FEMA basin and City basin floodplains (Dry Creek, Spring Creek, Boxelder Creek, Cooper Slough, Old Town, West Vine, Canal Importation, Fossil Creek, Mail Creek, McClellands Creek and Foothills); and 12 inches above base flood elevation for additions, substantial improvements, and accessory structures in those same basin floodplains.

Where the lowest floor is measured depends on the foundation type: at the top of the slab for slab-on-grade, the top of the basement slab for a basement, or interior grade for a noncompliant crawl space or enclosure. Nonresidential structures, accessory structures and attached garages may substitute floodproofing under Section 10-38 if flood depth around the structure does not exceed 3 feet, and qualifying crawl spaces and enclosures may use the venting standards of Section 10-39 instead of full elevation. Before the City's Utilities Executive Director will release a certificate of occupancy, the owner must submit a FEMA elevation certificate signed by a registered professional land surveyor documenting the as-built elevation.

Violations & Fines

Building without complying with Section 10-37 violates Chapter 10, Article II under Section 10-22. Fort Collins treats noncompliance as a misdemeanor, punishable under the general penalty of Section 1-15, currently a fine of up to $2,650, imprisonment up to 180 days, or both. Each day a noncompliant structure remains in that condition counts as a separate offense, and the City can still pursue injunctions or other lawful remedies beyond the criminal fine, including refusing a certificate of occupancy until the required elevation certificate is on file.

Frequently Asked Questions

Does Fort Collins require more than the FEMA minimum flood elevation?
Yes. FEMA sets the base flood elevation, but Section 10-37(c) of the Municipal Code adds freeboard on top of it: 24 inches in the Poudre River floodplain, and 18 inches (new construction) or 12 inches (additions, substantial improvements, accessory structures) in FEMA basin and City basin floodplains, such as Spring Creek and Fossil Creek.
Can I floodproof my building instead of raising it?
Only if it qualifies. Section 10-38 allows floodproofing in place of elevation for nonresidential structures, the nonresidential part of a mixed-use building, accessory structures, and attached garages, but only where surrounding flood depth is 3 feet or less and the structure is built watertight to the regulatory flood protection elevation.
What happens if I skip the elevation certificate?
The Utilities Executive Director will not release a certificate of occupancy without a FEMA elevation certificate signed and certified by a registered professional land surveyor documenting the as-built elevation of the structure, so occupancy is effectively blocked until that document is on file.
What is the penalty for building below the required elevation in Fort Collins?
It is a misdemeanor under Section 10-22, punishable under the City's general penalty in Section 1-15, currently up to a $2,650 fine and up to 180 days in jail, with each day of noncompliance charged as a separate offense.

Sources & Official References

Other rules in Fort Collins

All Fort Collins rules

Compare Fort Collins to another location·View the Colorado environmental rules overview

Get notified when Flood Elevation Requirements in Fort Collins, CO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.