Onslow County, NC Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Freeboard added to BFE
- Two feet
- No-BFE default elevation
- Two feet above highest adjacent grade
- Applies to
- New construction and substantial improvements
- Certification required
- Pre-construction, post-reference-level, final as-built
- Administering official
- Floodplain administrator
- Maximum fine
- $50.00 or 30 days, or both
Summary
Onslow County requires new and substantially improved buildings in special flood hazard areas to be elevated to two feet above the base flood elevation, or two feet above the highest adjacent grade where no BFE has been set, under the Flood Damage Prevention chapter.
Regulatory flood protection elevation means the elevation, in relation to mean sea level, to which the reference level of all structures and other development located within special flood hazard areas must be protected. Where base flood elevations (BFEs) have been determined, this elevation shall be the BFE plus two feet of freeboard. Where no BFE has been established, this elevation shall be at least two feet above the highest adjacent grade. ... (1)Residential construction. New construction or substantial improvement of any residential structure (including manufactured homes) shall have the reference level, including basement, elevated no lower than the regulatory flood protection elevation, as defined in section 7-5 of this chapter.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 10).
Full Breakdown
Sec. 7-5 defines the regulatory flood protection elevation as the elevation to which a structure's reference level must be protected in a special flood hazard area: where FEMA has determined a base flood elevation (BFE), the regulatory elevation is the BFE plus two feet of freeboard; where no BFE has been established, it is at least two feet above the highest adjacent grade. That standard is not academic; Sec. 7-97(1) requires that new construction or substantial improvement of any residential structure, including manufactured homes, have its reference level, including any basement, elevated no lower than the regulatory flood protection elevation.
Nonresidential buildings get the same elevation standard under Sec. 7-97(2), though they may floodproof to that elevation instead if a registered engineer or architect certifies the design. The two feet of freeboard exists precisely to buffer against the engineering uncertainty and watershed development changes noted in the Sec. 7-5 definition. Compliance is checked through the certification pipeline in Sec. 7-67(3): an elevation certificate is required before construction starts, another within seven days after the reference level is established, and a final as-built elevation certificate before the county issues a certificate of compliance or occupancy.
The floodplain administrator reviews each certificate and can require corrections before construction proceeds. This freeboard requirement applies to development within Onslow County's mapped special flood hazard areas in the unincorporated county; it does not govern Camp Lejeune's own flood construction standards on federal land.
Violations & Fines
Sec. 7-38 makes any violation of the flood damage prevention chapter, including building below the required freeboard elevation, a misdemeanor punishable by a fine of not more than $50.00 or imprisonment of not more than 30 days, or both, with each day of continued violation a separate offense; the county can also pursue civil or equitable remedies to force correction.
Frequently Asked Questions
How high above the base flood elevation must a new Onslow County home be built?
What if FEMA has not set a base flood elevation for a lot?
When are elevation certificates due during construction?
Sources & Official References
Other rules in Onslow County
Compare Onslow County to another location·View the North Carolina environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.