Killeen, TX Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Freeboard
- Two feet above base flood elevation
- Governing section
- City Code Sec. 12-62(1)
- Permit
- Floodplain development permit required
- Administrator
- Building official (floodplain admin)
- Flood maps
- Bell County FIS, Sept. 26, 2008
Summary
In Killeen's FEMA special flood hazard areas, new and substantially improved residential structures must have their lowest floor, including any basement, elevated at least two feet above the base flood elevation, certified by a Texas-registered engineer, architect, or surveyor.
Residential construction. New construction and substantial improvement of any residential structure shall have the lowest floor (including basement), elevated at least two (2) feet above the base flood elevation. A Texas registered professional engineer, architect, or land surveyor shall submit a certification to the floodplain administrator that the standard of this section as proposed in section 12-39(a)(1), and the standards of the city's adopted drainage design manual is satisfied.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 38 Update 1).
Full Breakdown
Killeen Code of Ordinances Sec. 12-62(1) requires the lowest floor, including basement, of every new or substantially improved residential structure in a special flood hazard area to sit at least two feet above the base flood elevation: a full two-foot freeboard above the FEMA minimum. Nonresidential buildings meet the same two-foot mark or are floodproofed to that level. Killeen's building official, serving as floodplain administrator, issues the mandatory floodplain development permit, and a Texas-registered professional engineer, architect, or land surveyor must certify the elevation. Flood zones follow the Flood Insurance Study, Bell County, Texas, dated September 26, 2008.
Violations & Fines
Building or substantially improving in a special flood hazard area without a floodplain development permit, or below the two-foot elevation, violates Chapter 12. The board of adjustment hears variance requests and appeals of the floodplain administrator's decisions.
Frequently Asked Questions
How high must a new Killeen home be built in a flood zone?
Who certifies the elevation?
Can I get a variance to build lower?
Sources & Official References
Other rules in Killeen
Texas rules heatmap·Compare Killeen to another location·View the Texas environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.