Roswell, GA Environmental Rules: Flood Elevation Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Freeboard
3 ft above base flood elevation
Alternate freeboard
1 ft above future-conditions elevation
Applies to
future-conditions floodplain new construction
Administered by
Floodplain Ordinance Administrator

Summary

In Roswell, Georgia's flood hazard areas, new residential construction must set the lowest floor at least 3 feet above the base flood elevation, or 1 foot above the future-conditions elevation, whichever is higher.

a. New Construction. New construction of principal residential structures is not allowed within the limits of the future-conditions floodplain unless all requirements of Sec. 12.7.4.C., D. and E. have been met. If all of the requirements... have been met, all new construction must have the lowest floor, including basement, elevated no lower than 3 feet above the base flood elevation or 1 foot above the future-conditions flood elevation, whichever is higher.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 17 | Unified Development Code: Supplement 5).

Full Breakdown

Roswell, Georgia's flood damage prevention ordinance requires new principal residential construction within the future-conditions floodplain to elevate the lowest floor, including any basement, no lower than 3 feet above the base flood elevation or 1 foot above the future-conditions flood elevation, whichever figure is higher. The same standard applies to substantial improvements of existing homes. The Floodplain Ordinance Administrator, the Engineering Director or a designee, reviews site plans, elevation certificates, and floodproofing certifications against FEMA's Flood Insurance Study before any permit issues, and a final Elevation Certificate must be filed after construction is complete.

Violations & Fines

A structure lacking the required elevation certificate or other compliance documentation is presumed to be in violation of the flood ordinance until that proof is provided.

Frequently Asked Questions

How much freeboard does Roswell, GA require above base flood elevation?
New residential construction's lowest floor must sit at least 3 feet above the base flood elevation, or 1 foot above the future-conditions flood elevation, whichever is higher.
What happens if I build without an elevation certificate?
The structure is presumed in violation of Roswell's flood damage prevention ordinance until you provide the required elevation certificate or other compliance documentation.

Sources & Official References

Other rules in Roswell

All Roswell rules

Compare Roswell to another location·View the Georgia environmental rules overview

Get notified when Flood Elevation Requirements in Roswell, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Flood Elevation Requirements in Nearby Cities

How other cities in Fulton County handle flood elevation requirements.

Atlanta, GA
Some Restrictions