Skip to main content
CityRuleLookup

Round Rock, TX Environmental Rules: Flood Elevation Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified July 2026

Key Facts

Freeboard
One foot above 100-year flood
Code section
§ 14-119(c)
Applies to
Lots in/near 100-year floodplain
Fixed by
Final subdivision plat
Enforced by
Planning & Development Services

Summary

Round Rock requires any structure built on a lot within or adjacent to the 100-year floodplain to have its finished floor slab set at least one foot above the 100-year flood level, fixed on the final subdivision plat.

(a) Preliminary plans for subdivisions shall show the limits of the 25- and 100-year floodplain for all waterways drainage 50 or more acres. ... (c) The final plat shall establish specific minimum floor slab elevations for construction of any structures on a lot adjacent to or within and adjacent to any 100-year floodplain area to assure future structures are constructed a minimum of one foot above the 100-year storm levels.

Full Breakdown

The rule sits in Chapter 14 (Environment), Article V, Stormwater Drainage. Section 14-119(c) directs that the final plat establish specific minimum floor slab elevations for structures on any lot within or adjacent to a 100-year floodplain, guaranteeing at least one foot above the 100-year storm levels. Preliminary plans must map the 25- and 100-year floodplain for waterways draining 50 or more acres, and an engineer must certify that slab elevations and drainage notes meet city criteria. Round Rock Planning and Development Services administers plat and building-permit review; the design engineer must certify compliance before a certificate of occupancy issues.

Violations & Fines

A final plat lacking certified minimum slab elevations will not be approved, and the city withholds building permits and the certificate of occupancy until the design engineer certifies drainage and elevation compliance.

Frequently Asked Questions

How high must a floor be above the floodplain in Round Rock?
At least one foot above the 100-year storm level. The minimum floor slab elevation is set on the recorded final plat for any lot within or adjacent to the 100-year floodplain.
Does Round Rock have a separate FEMA flood damage prevention ordinance?
No standalone FEMA chapter. The elevation requirement lives in the stormwater drainage code, § 14-119. An engineer must certify slab and drainage compliance before the plat and certificate of occupancy.
Which structures does the rule cover?
Any structure on a lot adjacent to or within the 100-year floodplain. Preliminary subdivision plans must show the 25- and 100-year floodplain limits for waterways draining 50 or more acres.

Sources & Official References

Other rules in Round Rock

All Round Rock rules

Texas rules heatmap·Compare Round Rock to another location·View the Texas environmental rules overview

Get notified when Flood Elevation Requirements in Round Rock, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Flood Elevation Requirements in Nearby Cities

How other cities in Williamson County handle flood elevation requirements.

Cedar Park, TX
Some Restrictions