Warner Robins, GA Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Freeboard, BFE available
- 18 inches above base flood elevation
- No published BFE data
- 3 feet above highest adjacent grade
- Manufactured home alternative
- Piers at least 36 inches above grade
- Certification required
- By licensed engineer or land surveyor
- Missing certification
- Stop-work order; presumed violation
Summary
Warner Robins requires new construction and substantially improved structures in mapped flood hazard areas to elevate their lowest floor at least 18 inches above the base flood elevation, a freeboard margin set in Code of Ordinances Sec. 24-425. Streams without published base flood data get a 3-foot-above-grade elevation standard instead.
New construction and/or substantial improvements. Where base flood elevation data are available, new construction and/or substantial improvement of any structure or manufactured home shall have the lowest floor, including basement, elevated no lower than eighteen (18) inches above the base flood elevation. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate equalization of flood hydrostatic forces on both sides of exterior walls shall be provided in accordance with standards of subsection (a)(4), "Elevated buildings".
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 69).
Full Breakdown
Sec. 24-425(b)(1) sets the core freeboard standard: where base flood elevation (BFE) data are available, "new construction and/or substantial improvement of any structure or manufactured home shall have the lowest floor, including basement, elevated no lower than eighteen (18) inches above the base flood elevation," and any heating, air conditioning, electrical, ventilation or plumbing equipment must be elevated to that same 18-inch freeboard. Non-residential structures may be floodproofed instead of elevated, but must be watertight to 18 inches above the BFE and certified by a registered professional engineer or architect under Sec.
24-425(b)(2). Manufactured homes get the identical 18-inch lowest-floor standard, or alternatively must sit on reinforced piers at least 36 inches above grade, per Sec. 24-425(b)(3). Where a stream has no published BFE, Sec. 24-425(c)(3) instead requires the lowest floor to sit at least 3 feet above the highest adjacent grade at the building site. In AO shallow-flooding zones, Sec. 24-425(e) requires elevation to the flood depth number shown on the FIRM, or 3 feet above the highest adjacent grade if no depth number is given.
Sec. 24-422 defines "freeboard" as the safety-factor cushion above the calculated flood level that compensates for unknown risks like wave action and urbanization effects, and defines base flood elevation as the elevation shown on the FIRM for a flood with a one-percent annual chance of being equaled or exceeded. Sec. 24-424(b)(2) requires the permit holder to submit an as-built elevation certification, prepared by a professional engineer or licensed land surveyor, immediately after the lowest floor or floodproofing is complete; uncorrected deficiencies or a missing certification triggers a stop-work order.
Violations & Fines
A structure built without the required elevation certificate or other proof of compliance is "presumed to be in violation until such time as that documentation is provided" under the Sec. 24-422 definition of "violation." Failing to submit the as-built certification, or to correct deficiencies the city engineer identifies in it, is cause for the city engineer to issue a stop-work order under Sec. 24-424(b)(2), and any general division violation carries the fine and daily-offense penalty set out in Sec. 24-423(h).
Frequently Asked Questions
How high above the flood level must I build in Warner Robins?
What if my street has no official base flood elevation on file?
Do manufactured homes get the same freeboard rule?
Sources & Official References
Other rules in Warner Robins
Compare Warner Robins to another location·View the Georgia environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.