FEMA flood zone rules in Gastonia, NC, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.
Key Facts
- Floodplain BMP approval
- Stormwater administrator AND Floodplain Manager
- Design requirement
- NC-licensed Professional Engineer
- Runoff control
- 100-year and two-year storm events
- Soil analysis
- Seasonal high water table by licensed soil scientist
- Governing standard
- Floodplain "no-rise" restriction (Sec. 14-738(c)(1)(viii))
Summary
Any stormwater control measure Gastonia developers place inside a floodplain needs sign-off from both the stormwater administrator and the city's Floodplain Manager before construction. Sec. 14-738(c)(1)(viii) folds federal "no-rise" floodway protection into the city's post-construction stormwater ordinance, requiring a licensed engineer's design and peak-runoff control for the 100-year and two-year storms.
The implementation of a stormwater control measure in a floodplain will have the following parameters: (1) prior approval from both the stormwater administrator and the City of Gastonia's Floodplain Manager, (2) the SCM must be designed by a North Carolina Board licensed Professional Engineer, (3) the stormwater control measure will meet the floodplain "no-rise" restrictions, (4) control of peak runoff for the 100-year and two-year storms, (5) the seasonal high water table (SHWT) will be established by a North Carolina licensed soil scientist to assure that the control measure impounding and water quality components are accounted for accurately
Full Breakdown
Gastonia's post-construction stormwater ordinance, Chapter 14, Article VI, Division 4, folds floodway protection directly into its design requirements rather than housing flood-zone rules in a stand-alone chapter. Sec. 14-738(c)(1)(viii) lists five conditions that apply whenever a structural stormwater control measure is sited within a floodplain: prior approval from both the stormwater administrator and the City of Gastonia's Floodplain Manager; a design prepared by a North Carolina-licensed Professional Engineer; compliance with the floodplain "no-rise" restriction; control of peak runoff for both the 100-year and two-year storm events; and a seasonal high water table established by a North Carolina-licensed soil scientist so the impounding and water-quality components are sized accurately.
This provision sits inside the broader high-density project standards of Sec. 14-738(c), which otherwise require capturing the first inch of rainfall, an 85 percent average annual removal rate for total suspended solids, and an enforceable deed restriction running with the land. Because the floodplain parameters attach specifically to control-measure siting, any developer proposing a pond, wetland, or other structure inside a mapped floodplain must clear the Floodplain Manager's review in addition to the standard stormwater permit process under Sec. 14-734; the design cannot proceed on the stormwater administrator's approval alone. Sec. 14-731(a) traces the ordinance's authority to G.S. 143-214.7, Session Law 2004-163, and Chapter 113A, Article 21, Part 6 of the General Statutes, the state's floodway regulation article, so the city's floodway approval requirement rests on that state grant.
Violations & Fines
A stormwater control measure built in a floodplain without the Floodplain Manager's sign-off, or one that fails the "no-rise" standard, falls under the same Sec. 14-746/14-747 enforcement scheme covering the rest of the stormwater ordinance: each day of noncompliance is a separate offense, the administrator can issue a stop-work order or withhold a certificate of occupancy, and the city may pursue a civil penalty payable within 30 days of notice or prosecute the violation as a misdemeanor.
Frequently Asked Questions
Does Gastonia require special approval to build stormwater ponds in a floodplain?
What is the floodplain "no-rise" restriction in Gastonia's code?
Which storm events must a floodplain stormwater structure control?
Sources & Official References
Other rules in Gastonia
Compare Gastonia to another location·View the North Carolina environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.