FEMA flood zone rules in Gastonia, NC, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.

Key Facts

Floodplain BMP approval
Stormwater administrator AND Floodplain Manager
Design requirement
NC-licensed Professional Engineer
Runoff control
100-year and two-year storm events
Soil analysis
Seasonal high water table by licensed soil scientist
Governing standard
Floodplain "no-rise" restriction (Sec. 14-738(c)(1)(viii))

Summary

Any stormwater control measure Gastonia developers place inside a floodplain needs sign-off from both the stormwater administrator and the city's Floodplain Manager before construction. Sec. 14-738(c)(1)(viii) folds federal "no-rise" floodway protection into the city's post-construction stormwater ordinance, requiring a licensed engineer's design and peak-runoff control for the 100-year and two-year storms.

The implementation of a stormwater control measure in a floodplain will have the following parameters: (1) prior approval from both the stormwater administrator and the City of Gastonia's Floodplain Manager, (2) the SCM must be designed by a North Carolina Board licensed Professional Engineer, (3) the stormwater control measure will meet the floodplain "no-rise" restrictions, (4) control of peak runoff for the 100-year and two-year storms, (5) the seasonal high water table (SHWT) will be established by a North Carolina licensed soil scientist to assure that the control measure impounding and water quality components are accounted for accurately

Full Breakdown

Gastonia's post-construction stormwater ordinance, Chapter 14, Article VI, Division 4, folds floodway protection directly into its design requirements rather than housing flood-zone rules in a stand-alone chapter. Sec. 14-738(c)(1)(viii) lists five conditions that apply whenever a structural stormwater control measure is sited within a floodplain: prior approval from both the stormwater administrator and the City of Gastonia's Floodplain Manager; a design prepared by a North Carolina-licensed Professional Engineer; compliance with the floodplain "no-rise" restriction; control of peak runoff for both the 100-year and two-year storm events; and a seasonal high water table established by a North Carolina-licensed soil scientist so the impounding and water-quality components are sized accurately.

This provision sits inside the broader high-density project standards of Sec. 14-738(c), which otherwise require capturing the first inch of rainfall, an 85 percent average annual removal rate for total suspended solids, and an enforceable deed restriction running with the land. Because the floodplain parameters attach specifically to control-measure siting, any developer proposing a pond, wetland, or other structure inside a mapped floodplain must clear the Floodplain Manager's review in addition to the standard stormwater permit process under Sec. 14-734; the design cannot proceed on the stormwater administrator's approval alone. Sec. 14-731(a) traces the ordinance's authority to G.S. 143-214.7, Session Law 2004-163, and Chapter 113A, Article 21, Part 6 of the General Statutes, the state's floodway regulation article, so the city's floodway approval requirement rests on that state grant.

Violations & Fines

A stormwater control measure built in a floodplain without the Floodplain Manager's sign-off, or one that fails the "no-rise" standard, falls under the same Sec. 14-746/14-747 enforcement scheme covering the rest of the stormwater ordinance: each day of noncompliance is a separate offense, the administrator can issue a stop-work order or withhold a certificate of occupancy, and the city may pursue a civil penalty payable within 30 days of notice or prosecute the violation as a misdemeanor.

Frequently Asked Questions

Does Gastonia require special approval to build stormwater ponds in a floodplain?
Yes. Sec. 14-738(c)(1)(viii) requires prior approval from both the stormwater administrator and the city's Floodplain Manager before any structural stormwater control measure is installed inside a floodplain, on top of the standard permit process under Sec. 14-734.
What is the floodplain "no-rise" restriction in Gastonia's code?
Sec. 14-738(c)(1)(viii) requires floodplain stormwater control measures to meet the "no-rise" restriction and to be engineered by a North Carolina-licensed Professional Engineer, so the design does not raise flood levels on neighboring property.
Which storm events must a floodplain stormwater structure control?
Under Sec. 14-738(c)(1)(viii), a stormwater control measure sited in a floodplain must control peak runoff for both the 100-year and the two-year storm, in addition to the seasonal high water table analysis a licensed soil scientist must perform.

Sources & Official References

Other rules in Gastonia

All Gastonia rules

Compare Gastonia to another location·View the North Carolina environmental rules overview

Get notified when Flood Zones in Gastonia, NC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.