FEMA flood zone rules in Bay County, FL, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.

Key Facts

Governing ordinance
Floodplain Management Ordinance, § 9-28 et seq.
Permit required
Any development in a mapped flood hazard area
Administrator
Building official acts as floodplain administrator
Map basis
FIS/FIRM dated October 24, 2024
Permit expiration
180 days if work not started
Max penalty
$500 fine, 60 days jail, § 9-35
Variance body
Code enforcement board, § 9-34

Summary

Bay County's Floodplain Management Ordinance requires a floodplain development permit for any construction, fill, grading or utility work wholly or partly within a mapped flood hazard area, on top of any Florida Building Code permit. The floodplain administrator, who is the building official, reviews elevation, substantial-improvement and coastal-construction issues before signing off.

These county ordinances apply to unincorporated areas of Bay County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Permits required. Any owner or owner's authorized agent (hereinafter "applicant") who intends to undertake any development activity within the scope of this article, including buildings, structures and facilities exempt from the Florida Building Code, which is wholly within or partially within any flood hazard area shall first make application to the floodplain administrator and shall obtain the required permit(s) and approval(s). No such permit or approval shall be issued until compliance with the requirements of this article and all other applicable codes and regulations has been satisfied.

Full Breakdown

Bay County Code of Ordinances § 9-31(a) requires any owner or authorized agent who intends to undertake development activity within a flood hazard area, including structures otherwise exempt from the Florida Building Code, to first apply to the floodplain administrator and obtain the required permits and approvals before starting work. 22. Section 9-29 adopts the Flood Insurance Study for Bay County dated October 24, 2024, and its accompanying Flood Insurance Rate Maps, as the minimum basis for mapping flood hazard areas; those studies and maps are on file at the Bay County Planning and Zoning Department at 840 W.

11th Street, Panama City. Applications reviewed under § 9-30 must show whether proposed work in a flood hazard area is a 'substantial improvement' or 'repair of substantial damage,' comparing project cost against the pre-work market value of the structure, because either finding triggers full flood-resistant construction compliance. Section 9-32 requires site plans to delineate flood zones and base flood elevations, and where FEMA has not mapped a base flood elevation, § 9-32(b)(3)b lets the administrator set it at two feet above the highest adjacent grade absent contrary evidence.

A permit becomes invalid if work is not started within 180 days of issuance or is suspended for 180 days, subject to written extensions under § 9-31(f). Owners seeking relief from the elevation standards must apply for a variance from the code enforcement board under § 9-34, which cannot grant relief that would raise base flood elevations in a floodway.

Violations & Fines

Section 9-35 makes it a violation to perform article-covered development without a floodplain permit, in conflict with an issued permit, or without required elevation certifications, which are presumed noncompliant until documentation is filed. A conviction carries a fine of up to $500.00, imprisonment in the county jail for up to 60 days, or both, and the floodplain administrator may also issue stop-work orders or notices of violation under § 9-35(b).

Frequently Asked Questions

Do I need a separate permit for building in a Bay County flood zone?
Yes, in many cases. Section 9-31(a) requires a floodplain development permit or approval from the floodplain administrator for development in a flood hazard area, including structures exempt from the Florida Building Code such as fences, tanks, pools and recreational vehicle placement; the floodplain administrator may require this permit in addition to a standard building permit.
What maps does Bay County use to define flood hazard areas?
Section 9-29(c) adopts the Flood Insurance Study for Bay County dated October 24, 2024, and its accompanying Flood Insurance Rate Maps, along with all later amendments, as the minimum basis for flood hazard boundaries. Copies are kept on file at the Bay County Planning and Zoning Department at 840 W. 11th Street in Panama City.
Can I get a variance from Bay County's flood elevation rules?
The code enforcement board hears variance requests under § 9-34, but it cannot grant one that would increase base flood elevations in a regulatory floodway. Approved variances for new construction below the required elevation must include written notice that federal flood insurance costs could run as high as $25.00 per $100.00 of coverage.
What happens if I build in a flood zone without a permit?
Section 9-35 treats unpermitted or noncompliant development in a flood hazard area as a violation, punishable by a fine up to $500.00, up to 60 days in jail, or both. The floodplain administrator can also issue a stop-work order or notice of violation, and a building lacking required elevation certification is presumed to be in violation until documentation is provided.

Sources & Official References

Other rules in Bay County

All Bay County rules

Florida rules heatmap·Compare Bay County to another location·View the Florida environmental rules overview

Get notified when Flood Zones in Bay County, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.