FEMA flood zone rules in Madison County, IL, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.

Key Facts

Permit required
Any development or critical facility in the floodplain
Critical facility threshold
Below the 0.2% annual chance flood elevation
Permit expiration
180 days to start, 12 months to finish
Fine range
$50 to $750 per day, per offense
Enforcing office
Madison County Zoning Administrator
Governing ordinance
Ch. 94, adopted by Ord. 2022-04

Summary

Anyone developing land in a mapped floodplain within unincorporated Madison County must first obtain a development permit from the Zoning Administrator under Chapter 94. Critical facilities need a permit before building below the 0.2% annual chance flood elevation. The rule protects the county's National Flood Insurance Program eligibility and applies to new construction, substantial improvements, fill, grading and manufactured homes.

These county ordinances apply to unincorporated areas of Madison County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(1) No person, firm, corporation, or governmental body, not exempted by law, shall commence any development in the floodplain without first obtaining a development permit from the Zoning Administrator. (2) No person, firm, corporation, or governmental body shall commence any development of a critical facility on land below the 0.2% annual chance flood elevation without first obtaining a development permit from the Zoning Administrator.

Full Breakdown

05(B)) must include a scaled site plan showing property lines, existing and post-development grade elevations, sewage and water facilities, floodplain and floodway limits, and the elevation of the lowest floor of every proposed building, plus a licensed engineer's or contractor's cost estimate. 03 to decide whether the chapter applies, and must confirm every other required federal, state and local permit is in hand before issuing the county permit. A permit lapses if construction has not actually started within 180 days of issuance or is suspended for 180 days, and all permitted work must finish within 12 months; the Administrator can grant 180-day extensions if the project still meets the current flood maps.

07's flood protection standards, backed by a FEMA elevation certificate. 07's protections can raise flood insurance premiums by up to $25 per $100 of coverage.

Violations & Fines

Under § 94.99, the Zoning Administrator who finds a floodplain violation must notify the owner in writing; if the owner does not correct it within ten days, the county seeks a Circuit Court injunction, fines the violator $50 to $750 per offense with each day a separate offense, and records a notice of violation against the property's title. The Administrator must also warn the owner that ignoring the notice is treated as a willful act that can suspend the property's Standard Flood Insurance Policy coverage.

Frequently Asked Questions

Do I need a permit to build in the Madison County floodplain?
Yes. Under Madison County Code § 94.05, anyone developing land in an unincorporated floodplain, including new construction, fill, grading or a manufactured home, must get a development permit from the Zoning Administrator first. The application needs a scaled site plan showing grade elevations, floodplain and floodway limits, and the elevation of the lowest floor of every proposed building.
What happens if I develop in the floodplain without a permit?
The Zoning Administrator notifies you in writing, and you get ten days to correct the violation. After that the county can seek a Circuit Court injunction and fine you $50 to $750 for each day the violation continues, plus record a notice of violation on your property's title under § 94.99.
Can I get a variance from the floodplain rules?
Only if the County Board finds all eight conditions in § 94.11 are met, including that the development cannot go anywhere outside the floodplain and that denying the variance would leave the lot undevelopable. No variance can increase the base flood elevation within a mapped floodway.

Sources & Official References

Other rules in Madison County

All Madison County rules

Compare Madison County to another location·View the Illinois environmental rules overview

Get notified when Flood Zones in Madison County, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.