Skip to main content
CityRuleLookup

El Paso County, CO Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Section
LDC § 8.4.5
Governing manuals
Engineering & Drainage Criteria Manuals
Applies to
Land divisions, unincorporated county
Lot grading
Must drain away from buildings

Summary

El Paso County requires every land division's drainage facilities to preserve historical flow patterns, avoid flooding neighbors, and grade lots for positive drainage before the county approves a subdivision plat.

City-specific rules exist: Colorado Springs has its own stormwater management rules that differ from El Paso County's county-level regulations. If you live in Colorado Springs, check the city-specific page instead.

The design and operation of the drainage facilities serving a division of land shall ensure that: Historical flow patterns are maintained in a manner that will reasonably preserve the natural character of the area and prevent property damage of the type generally attributed to runoff peak flow and velocity increases, diversions, concentration and unplanned ponding of storm runoff... Lots and tracts shall be laid out to provide positive drainage away from building sites.

Source: Colorado Springs StormwaterView official code

Full Breakdown

Under LDC §8.4.5, applicants must design drainage so runoff peaks, diversions and ponding don't damage other property, and lots must be graded to drain away from building sites, consistent with the applicable drainage basin planning study. All drainage and bridge facilities must meet the El Paso County Engineering Criteria Manual and Drainage Criteria Manual, and maintenance provisions for detention basins must be secured through covenants or a Private Detention Basin Maintenance Agreement before plat approval.

Violations & Fines

Plat and construction-drawing approval withheld until the drainage report and facilities meet ECM/Drainage Criteria Manual standards; noncompliant grading is a Land Development Code violation.

Frequently Asked Questions

Does El Paso County have its own stormwater rules for new subdivisions?
Yes. LDC §8.4.5 requires drainage design that preserves historical flow patterns and lot grading that drains away from building sites, per the county's Engineering and Drainage Criteria Manuals.
Who maintains detention basins built for a subdivision?
The applicant must provide for maintenance, often through a Private Detention Basin Maintenance Agreement and Easement or covenants binding lot owners, per §8.4.5(A).

Sources & Official References

Other rules in El Paso County

All El Paso County rules

Compare El Paso County to another location·View the Colorado environmental rules overview

Get notified when Stormwater Management in El Paso County, CO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Stormwater Management in Cities Across El Paso County