Boone County, MO Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required
Before any stormwater facility construction
Design standard
Boone County Stormwater Design Manual
Applies to
New development, 3,000+ sq ft redevelopment
Enforced by
Resource Management Director
Legal authority
RSMo §§ 64.907, 64.825-64.885

Summary

Boone County requires a stormwater discharge permit and an approved management plan before building, altering, or reconstructing any stormwater drainage facility on new or redeveloped land.

City-specific rules exist: Columbia has its own stormwater management rules that differ from Boone County's county-level regulations. If you live in Columbia, check the city-specific page instead.

No stormwater drainage facility shall be constructed, altered or reconstructed without a stormwater discharge permit. To obtain a permit, the application form provided by the County shall be completed and plans must be submitted for review and approval of the Director. All such construction shall comply with the general requirements and design procedures, as set forth in this chapter, and the criteria of the Boone County Stormwater Design Manual.

(3) Prior to the issuance by the County of a permit for any type of construction, the property owner, the developer or their agent shall have a stormwater management plan approved by the County in accordance with Section 28.3. The property owner, developer or their agent shall, at his own expense, submit necessary plans, designs and specifications to the County for review and approval. This plan shall: � Include a pre- and post-development hydrologic analysis of the site; � Identify pollutants of concern for each area of the site; � Identify pollution prevention measures; � Identify controls that provide treatment and reduce stormwater volumes and velocities; � Identify any environmentally sensitive areas and provide a plan for protection of these areas per this chapter; � Identify Low Impact Development opportunities that can best mimic the natural hydrology of the site and filter pollutants from

View official code

Official source re-checked September 7, 2026: the cited page had not changed since it was quoted.

Full Breakdown

Boone County's zoning ordinance regulates stormwater at Section 28. Any new land development, or redevelopment adding 3,000+ square feet of impervious cover, triggers the ordinance (§ 28.1.3). Before building, altering or reconstructing a stormwater drainage facility, the owner must obtain a stormwater discharge permit from the Director and submit plans meeting the Boone County Stormwater Design Manual (§ 28.8.2). Applicants must also secure a preliminary stormwater management plan under § 28.3 covering pre- and post-development hydrology, pollutant controls and BMP siting before any permit issues. Agricultural and silvicultural projects are exempt (§ 28.1.4).

Violations & Fines

Non-compliance triggers a stop-work order and permit suspension; a second violation revokes the permit, and building without a required permit doubles the permit fee (§ 28.9.1).

Frequently Asked Questions

Does Boone County require a stormwater permit for new construction?
Yes. No stormwater drainage facility may be built, altered or reconstructed without a county stormwater discharge permit and an approved plan (§ 28.8.2).
What standard must stormwater designs meet?
Designs must follow the Boone County Stormwater Design Manual under § 28.4.1(3), unless the Director grants a variance.

Sources & Official References

Other rules in Boone County

All Boone County rules

Compare Boone County to another location·View the Missouri environmental rules overview

Get notified when Stormwater Management in Boone County, MO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Stormwater Management in Cities Across Boone County