Key Facts
- Governing section
- Glenn County Code § 15.65.010
- Flood design standard
- 100-year frequency flood
- Minimum pipe under driveways
- 12-inch inside diameter
- Minimum drainage easement
- 12 ft closed, 20 ft open system
- Approving authority
- Public works director
Summary
New subdivisions in unincorporated Glenn County must be engineered to withstand a one-hundred-year flood without damaging structures or neighboring property, and stormwater cannot be discharged onto county roads without the public works director's approval, under Code Section 15.65.010. Chapter 15.65 sets the pipe sizes, easement widths and channel standards that carry that requirement into design specifics.
All subdivisions shall be protected from flood hazard and inundation by storm waters originating without and within the proposed subdivision. The design and construction of drainage facilities shall be such that water courses traversing the subdivision and water emanating from within the subdivision will be carried through and off the subdivision without injury to improvements, residential sites, or adjacent properties. Drainage waters shall not be discharged onto existing county rights-of-way except in manner approved by the public works director.
Full Breakdown
010 requires every subdivision to be protected from flood hazard and inundation by storm water originating both on and off the property, with drainage facilities designed so water is carried through and off the site without injury to improvements, residential sites or adjacent land, and bars discharging drainage water onto existing county rights-of-way except as the public works director approves. 030 translates that into engineering numbers: drainage systems and bridges must pass a one-hundred-year frequency flood without damage, though systems draining less than one square mile may be designed to the ten-year standard if ponding from a bigger storm would cause no damage.
Pipes under driveway entrances need at least a twelve-inch inside diameter and a one-percent minimum slope where practical; pipes crossing streets need at least fifteen inches for concrete or eighteen inches for corrugated metal pipe, and all pipe in the right-of-way must carry a twenty-five-year design life. 020 requires drainage facilities to sit in a dedicated street, road, lane or public drainage easement, with a minimum twelve-foot easement for closed systems and twenty feet for open systems, and bars the county from maintaining any drainage facility outside a public right-of-way. 040, and new unlined drainage facilities cannot sit closer than fifty feet to an existing or proposed septic leach line. 050.
Violations & Fines
Subdivision construction plans that do not meet the one-hundred-year flood design standard, the minimum pipe diameters, or the easement widths set in Chapter 15.65 do not receive public works director approval, which holds up recording of the final map. Discharging drainage water onto a county road without the public works director's approval violates Section 15.65.010 directly and is enforced as a general code violation, an infraction on the first offense escalating to a misdemeanor with up to a $5,000 fine for repeat violations within 12 months under Sections 1.12.010 and 1.13.010.
Frequently Asked Questions
What flood standard must a new Glenn County subdivision's drainage meet?
Can a developer discharge subdivision stormwater onto a Glenn County road?
How close can a new drainage ditch be built to a septic leach line in Glenn County?
Sources & Official References
Other rules in Glenn County
California rules heatmap·Compare Glenn County to another location·View the California environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.